Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 01-2004

NOTICES

TURNPIKE COMMISSION

Retention of an Engineering Firm

[31 Pa.B. 6129]

In-Depth Inspection of the Tuscarora Tunnel Huntingdon County

Reference No. 2-061

   The Turnpike Commission (Commission) will retain an engineering firm to perform a detailed inspection of both tubes of the Tuscarora Tunnel, located at Milepost 186.20 in Huntingdon County. Inspection services for the engineering firm of the tunnel will include, but not be limited to: structural integrity, drainage, electrical, mechanical, lighting and the portal buildings. Inspection of the roadway pavement will not be a part of this inspection. The successful firm will be required to prepare an inspection report, listing all findings and recommendations.

   The following factors will be considered by the Commission during the evaluation of the firms submitting Letters of Interest for this project:

   a.  Specialized experience and technical competence of prime consultant and subconsultants. The Team must clearly demonstrate an ability to analyze available data to make decisions and develop plans to complete the project in a timely and cost effective manner.

   b.  Past record of performance with respect to cost control, work quality, ability to meet schedules and previous experience on similar projects. The consultant should identify similar projects that have been completed by that firm as the prime, the magnitude of the project and the client.

   c.  The specific experience and number of individuals who constitute the firm. Firms should have sufficient qualified permanent full-time personnel to complete mapping work assignments with short delivery schedules utilizing current state-of-the-art photogrammetric instruments, equipment and software.

   d.  Workload of the prime consultant and subconsultants for all Department of Transportation (Department) and Commission projects.

   e.  Other factors, if any, specific to the project.

   Address these items and any necessary further details in a brief yet comprehensive manner in the letter of interest.

   Questions and inquiries concerning this solicitation should be directed to James L. Stump, P.E. at (717) 920-7105 or by e-mail at jstump@paturnpike.com. Contractual questions should be directed to George M. Hatalowich at (717) 986-8737 or by e-mail at ghatalow@paturnpike.com.

General Requirements and Information

   Firms interested in providing the previous work and services are invited to submit a Statement of Interest with the required information. The Statements of Interest must include the following:

   1.  One page transmittal letter clearly identifying the project reference number, brief description of the project from the advertisement, the firm's Federal identification number, the firm's legal name, contact person or project manager, address of corporate office and project office. (If the firm has multiple offices, the location of the office performing the work must be identified).

   2.  A three-page statement of interest on the advertised project. Each firm should demonstrate their ability to perform the specific requirements indicated for each project and provide explanation of the technical approach.

   3.  An organization chart for the Project, identifying key personnel and any subconsultants and their roles. Deviation from the subconsultant's listed in the statement of interest will require written approval from the Commission.

   4.  Tabulation or listing of workload for the prime consultant and all subconsultants for all Department and Commission projects. Do not graphically represent the firm's workload.

   5.  A Consultant Qualification Package similar to the one submitted to the Department for the current year or one that is best suited for this project. A copy of the Consultant Qualification Package printed directly from the Department's ECMS website is acceptable.

   The Consultant Qualification Package should contain at a minimum the following information for the prime consultant and all subconsultants and attached to the back of the statement of interest (subs to follow primes):

   *  ECMS General Information and Project Experience Forms or Standard Form (SF) 254 - Architect-Engineer and Related Services Questionnaire in its entirety, either not more than 1 year old as of the date of the advertisement.

   *  Resumes of key personnel expected to be involved in the project (limit to one 8 1/2 x 11 page, one side, per person). Only resumes of key personnel should be included.

   *  Copy of the firm's registration to do business in this Commonwealth as provided by the Department of State for firms with out-of-State headquarters or corporations not incorporated in this Commonwealth.

   *  A copy of the Department's DBE/WBE Certification, if applicable.

   If a Joint Venture responds to a project advertisement, the Commission will not accept separate statements of interest from joint venture constituents. A firm will not be permitted to submit a statement of interest on more than one joint venture for the same project reference number. Also, a firm that responds to a project as a prime may not be included as a designated subconsultant to another firm that responds to the same project advertisement. Multiple responses under any of the forgoing situations will cause the rejection of all responses of the firm or firms involved. This does not preclude a firm from being set forth as a designated subconsultant to more than one prime consultant responding to the project advertisement.

   Small firms, disadvantaged business enterprise firms and other firms who have not previously performed work for the Commission are encouraged to submit a statement of interest.

   Firms interested in performing the previous services are invited to submit a statement of interest and required information to George M. Hatalowich, Engineering Contract Manager, at the Turnpike Commission Administration Building located at 700 South Eisenhower Boulevard, Middletown, PA 17057 (street address). Our mailing address is P. O. Box 67676, Harrisburg, PA 17106-7676.

   The statement of interest and required information must be received by 12 p.m., Monday, November 26, 2001. Any statements of interest received after this date and time will be time-stamped and returned.

   Based on an evaluation of acceptable statements of interest received in response to these solicitations, one firm will be selected for this project. The order of preference will be established for the purpose of negotiating an agreement with the highest ranked firm established by the Technical Review Committee and approved by the Commission. Technical proposals will not be requested prior to the establishment of the final ranking.

   The Commission reserves the right to reject all statements of interest, to cancel solicitation requested under this notice and/or to readvertise solicitation for the work and services.

BRADLEY L. MALLORY,   
Chairperson

[Pa.B. Doc. No. 01-2004. Filed for public inspection November 2, 2001, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.