Subchapter D. WELL DRILLING, OPERATION AND PLUGGING

GENERAL

§ 78.71. Use of safety devices—well casing.

 (a) The operator shall equip the well with one or more strings of casing of sufficient cemented length and strength to attach proper well control equipment and prevent blowouts, explosions, fires and casing failures during installation, completion and operation.

 (b) The operator shall determine the amount and type of casing to be run and the amount and type of cement to be used in accordance with current prudent industry practices and engineering. In making the determinations, the operator shall consider the following:

 (1) Successful local practices for similar wells.

 (2) Maximum anticipated surface pressure.

 (3) Collapse resistance.

 (4) Tensile strength.

 (5) Chemical environment.

 (6) Potential mechanical damage.

 (7) Manufacturing standards, including American Petroleum Institute or equivalent specifications for pipe used in wells drilled below the Onondaga formation or where blow-out preventers are required.

§ 78.72. Use of safety devices—blow-out prevention equipment.

 (a) The operator shall use blow-out prevention equipment after setting casing with a competent casing seat in the following circumstances:

 (1) When drilling a well that is intended to produce natural gas from an unconventional formation.

 (2) When drilling out solid core hydraulic fracturing plugs to complete a well.

 (3) When well head pressures or natural open flows are anticipated at the well site that may result in a loss of well control.

 (4) When the operator is drilling in an area where there is no prior knowledge of the pressures or natural open flows to be encountered.

 (5) On wells regulated by the Oil and Gas Conservation Law (58 P. S. §§ 401—419).

 (6) When drilling within 200 feet of a building.

 (b) Blow-out prevention equipment used must be in good working condition at all times.

 (c) Controls for the blow-out preventer shall be accessible to allow actuation of the equipment. Additional controls for a blow-out preventer with a pressure rating of greater than 3,000 psi, not associated with the rig hydraulic system, shall be located at least 50 feet away from the drilling rig so that the blow-out preventer can be actuated if control of the well is lost.

 (d) The operator shall use pipe fittings, valves and unions placed on or connected to the blow-out prevention systems that have a working pressure capability that exceeds the anticipated pressures.

 (e) The operator shall conduct a complete test of the ram type blow-out preventer and related equipment for both pressure and ram operation before placing it in service on the well. The operator shall test the annular type blow-out preventer in accordance with the manufacturer's published instructions, or the instructions of a professional engineer, prior to the device being placed in service. Blow-out prevention equipment that fails the test may not be used until it is repaired and passes the test.

 (f) When the equipment is in service, the operator shall visually inspect blow-out prevention equipment during each tour of drilling operation and during actual drilling operations test the pipe rams for closure daily and the blind rams for closure on each round trip. When more than one round trip is made in a day, one daily closure test for blind rams is sufficient. Testing shall be conducted in accordance with American Petroleum Institute publication API RP53, ''API Recommended Practice for Blowout Prevention Equipment Systems for Drilling Wells,'' or other procedure approved by the Department. The operator shall record the results of the inspection and closure test in the drillers log before the end of the tour. If blow-out prevention equipment is not in good working order, drilling shall cease when cessation of drilling can be accomplished safely and not resume until the blow-out prevention equipment is repaired or replaced and re-tested.

 (g) All lines, valves and fittings between the closing unit and the blow-out preventer stack must be flame resistant and have a rated working pressure that meets or exceeds the requirements of the blow-out preventer system.

 (h) When a blowout preventer is installed or required under subsection (a), there shall be present on the well site an individual with a current certification from a well control course accredited by the International Association of Drilling Contractors or other organization approved by the Department. The certification shall be available for review at the well site. The Department will maintain a list of approved accrediting organizations on its web site.

 (i) Well drilling and completion operations requiring pressure barriers, as identified by the operator under § 78.55(b) (relating to control and disposal plan), shall employ at least two mechanical pressure barriers between the open producing formation and the atmosphere that are capable of being tested. The mechanical pressure barriers shall be tested according to manufacturer specifications prior to operation. If during the course of operations the operator only has one functioning barrier, operations must cease until additional barriers are added and tested or the redundant barrier is repaired and tested. Stripper rubber or a stripper head may not be considered a barrier.

 (j) A coiled tubing rig or a hydraulic workover unit with appropriate blowout prevention equipment must be employed during post completion cleanout operations in horizontal unconventional formations.

 (k) The minimum amount of intermediate casing that is cemented to the surface to which blow-out prevention equipment may be attached, shall be in accordance with the following:

Proposed Total Vertical Depth (in feet) Minimum Cemented Casing Required (in feet of casing cemented)
Up to 5,000 400
5,001 to 5,500 500
5,501 to 6,000 600
6,001 to 6,500 700
6,501 to 7,000 800
7,001 to 8,000 1,000
8,001 to 9,000 1,200
9,001 to 10,000 1,400
Deeper than 10,000 1,800

 (l) Upon completion of the drilling operations at a well, the operator shall install and utilize equipment, such as a shut-off valve of sufficient rating to contain anticipated pressure, lubricator or similar device, as may be necessary to enable the well to be effectively shut-in while logging and servicing the well and after completion of the well.

§ 78.73. General provision for well construction and operation.

 (a) The operator shall construct and operate the well in accordance with this chapter and ensure that the integrity of the well is maintained and health, safety, environment and property are protected.

 (b) The operator shall prevent gas, oil, brine, completion and servicing fluids, and any other fluids or materials from below the casing seat from entering fresh groundwater, and shall otherwise prevent pollution or diminution of fresh groundwater.

 (c) After a well has been completed, recompleted, reconditioned or altered the operator shall prevent surface shut-in pressure and surface producing back pressure inside the surface casing or coal protective casing from exceeding the following pressure: 80% multiplied by 0.433 psi per foot multiplied by the casing length (in feet) of the applicable casing.

 (d) After a well has been completed, recompleted, reconditioned or altered, if the surface shut-in pressure or surface producing back pressure exceeds the pressure as calculated in subsection (c), the operator shall take action to prevent the migration of gas and other fluids from lower formations into fresh groundwater. To meet this standard the operator may cement or install on a packer sufficient intermediate or production casing or take other actions approved by the Department. This section does not apply during testing for mechanical integrity in accordance with State or Federal requirements.

 (e) Excess gas encountered during drilling, completion or stimulation shall be flared, captured or diverted away from the drilling rig in a manner that does not create a hazard to the public health or safety.

 (f) Except for gas storage wells, the well must be equipped with a check valve to prevent backflow from the pipelines into the well.

§ 78.75a. Area of alternative methods.

 (a) The Department may designate an area of alternative methods if the Department determines that well drilling requirements beyond those provided in this chapter are necessary to drill, operate or plug a well in a safe and environmentally protective manner.

 (b) To establish an area of alternative methods, the Department will publish a notice in the Pennsylvania Bulletin of the proposed area of alternative methods and provide the public with an opportunity to comment on the proposal. After reviewing any comments received on the proposal, the Department will publish a final designation of the area and required alternative methods in the Pennsylvania Bulletin.

 (c) Wells drilled within an area of alternative methods established under subsection (b) must meet the requirements specified by the Department unless the operator obtains approval from the Department to drill, operate or plug the well in a different manner that is at least as safe and protective of the environment as the requirements of the area of alternative methods.

§ 78.76. Drilling within a gas storage reservoir area.

 (a) An operator proposing to drill a well within a gas storage reservoir area or a reservoir protective area to produce gas or oil shall forward by certified mail a copy of the well location plat, the drilling, casing and cementing plan and the anticipated date drilling will commence to the gas storage reservoir operator and to the Department for approval by the Department and shall submit proof of notification to the gas storage reservoir operator to the Department with the well permit application.

 (b) The storage operator may file an objection with the Department to the drilling, casing and cementing plan or the proposed well location within 15 days of receipt of the notification and request a conference in accordance with section 501 of the act (58 P. S. § 601.501).

CASING AND CEMENTING

§ 78.81. General provisions.

 (a) The operator shall conduct casing and cementing activities under this section and §§ 78.82—78.87 or an approved alternate method under § 78.75 (relating to alternative methods). The operator shall case and cement a well to accomplish the following:

 (1) Allow effective control of the well at all times.

 (2) Prevent the migration of gas or other fluids into sources of fresh groundwater.

 (3) Prevent pollution or diminution of fresh groundwater.

 (4) Prevent the migration of gas or other fluids into coal seams.

 (b) The operator shall drill through fresh groundwater zones with diligence and as efficiently as practical to minimize drilling disturbance and commingling of groundwaters.

§ 78.82. Use of conductor pipe.

 If the operator installs conductor pipe in the well, the following provisions apply:

 (1) The operator may not remove the pipe;

 (2) Conductor pipe shall be installed in a manner that prevents the subsurface infiltration of surface water or fluids by either driving the pipe into place or cementing the pipe from the seat to the surface;

 (3) Conductor pipe must be made of steel unless a different material is approved for use by the Department.

§ 78.83. Surface and coal protective casing and cementing procedures.

 (a) For wells drilled, altered, reconditioned or recompleted after February 5, 2011, surface casing or any casing functioning as a water protection casing may not be utilized as production casing unless one of the following applies:

 (1) In oil wells where the operator does not produce any gas generated by the well and the annulus between the surface casing and the production pipe is left open.

 (2) The operator demonstrates that the pressure in the well is no greater than the pressure permitted under 78.73(c) (relating to general provision for well construction and operation), demonstrates through a pressure test or other method approved by the Department that all gas and fluids will be contained within the well, and installs a working pressure gauge that can be inspected by the Department.

 (b) If the well is to be equipped with threaded and coupled casing, the operator shall drill a hole so that the diameter is at least 1 inch greater than the outside diameter of the casing collar to be installed. If the well is to be equipped with plain-end welded casing, the operator shall drill a hole so that the diameter is at least 1 inch greater than the outside diameter of the casing coupling.

 (c) The operator shall drill to approximately 50 feet below the deepest fresh groundwater or at least 50 feet into consolidated rock, whichever is deeper, and immediately set and permanently cement a string of surface casing to that depth. Except as provided in subsection (f), the surface casing may not be set more than 200 feet below the deepest fresh groundwater except if necessary to set the casing in consolidated rock. The surface hole shall be drilled using air, freshwater, or freshwater-based drilling fluid. Prior to cementing, the wellbore shall be conditioned to ensure an adequate cement bond between the casing and the formation. The surface casing seat shall be set in consolidated rock. When drilling a new well or redrilling an existing well, the operator shall install at least one centralizer within 50 feet of the casing seat and then install a centralizer in intervals no greater than every 150 feet above the first centralizer.

 (d) The operator shall permanently cement the surface casing by placing the cement in the casing and displacing it into the annular space between the wall of the hole and the outside of the casing.

 (e) Where potential oil or gas zones are anticipated to be found at depths within 50 feet below the deepest fresh groundwater, the operator shall set and permanently cement surface casing prior to drilling into a stratum known to contain, or likely containing, oil or gas.

 (f) If additional fresh groundwater is encountered in drilling below the permanently cemented surface casing, the operator shall document the depth of the fresh ground water zone in the well record and protect the additional fresh groundwater by installing and cementing a subsequent string of casing or other procedures approved by the Department to completely isolate and protect fresh groundwater. The string of casing may also penetrate zones bearing salty or brackish water with cement in the annular space being used to segregate the various zones. Sufficient cement shall be used to cement the casing to the surface. The operator shall install at least one centralizer within 50 feet of the casing seat and then install a centralizer in intervals no greater than, if possible, every 150 feet above the first centralizer.

 (g) The operator shall set and cement a coal protective string of casing through workable coal seams. The base of the coal protective casing shall be at least 30 feet below the lowest workable coal seam. The operator shall install at least two centralizers. One centralizer shall be within 50 feet of the casing seat and the second centralizer shall be within 100 feet of the surface.

 (h) Unless an alternative method has been approved by the Department in accordance with § 78.75 (relating to alternative methods), when a well is drilled through a coal seam at a location where the coal has been removed or when a well is drilled through a coal pillar, the operator shall drill to a depth of at least 30 feet but no more than 50 feet deeper than the bottom of the coal seam. The operator shall set and cement a coal protection string of casing to this depth. The operator shall equip the casing with a cement basket or other similar device above and as close to the top of the coal seam as practical. The bottom of the casing must be equipped with an appropriate device designed to prevent deformation of the bottom of the casing. The interval from the bottom of the casing to the bottom of the coal seam shall be filled with cement either by the balance method or by the displacement method. Cement shall be placed on top of the basket between the wall of the hole and the outside of the casing by pumping from the surface. If the operator penetrates more than one coal seam from which the coal has been removed, the operator shall protect each seam with a separate string of casing that is set and cemented or with a single string of casing which is stage cemented so that each coal seam is protected as described in this subsection. The operator shall cement the well to isolate workable coal seams from each other.

 (i) If the operator sets and cements casing under subsection (g) or (h) and subsequently encounters additional fresh groundwater zones below the deepest cemented casing string installed, the operator shall protect the fresh groundwater by installing and cementing another string of casing or other method approved by the Department. Sufficient cement shall be used to cement the casing to the surface. The additional casing string may also penetrate zones bearing brackish or salt water, but shall be run and cemented prior to penetrating a zone known to or likely to contain oil or gas. The operator shall install at least one centralizer within 50 feet of the casing seat and then, if possible, install a centralizer in intervals no greater than every 150 feet above the first centralizer.

 (j) If it is anticipated that cement used to permanently cement the surface casing cannot be circulated to the surface a cement basket may be installed immediately above the depth of the anticipated lost circulation zone. The casing shall be permanently cemented by the displacement method. Additional cement may be added above the cement basket, if necessary, by pumping through a pour string from the surface to fill the annular space. Filling the annular space by this method does not constitute permanently cementing the surface or coal protective casing under § 78.83b (relating to casing and cementing-lost circulation).

§ 78.83a. Casing and cementing plan.

 (a) The operator shall prepare and maintain a casing and cementing plan showing how the well will be drilled and completed. The plan must demonstrate compliance with this subchapter and include the following information:

 (1) The anticipated depth and thickness of any producing formation, expected pressures, anticipated fresh groundwater zones and the method or information by which the depth of the deepest fresh groundwater was determined.

 (2) The diameter of the borehole.

 (3) Casing type, whether the casing is new or used, depth, diameter, wall thickness and burst pressure rating.

 (4) Cement type, yield, additives, and estimated amount.

 (5) The estimated location of centralizers.

 (6) The proposed borehole conditioning procedures.

 (7) Alternative methods or materials as required by the Department as a condition of the well permit.

 (b) The plan shall be available at the well site for review by the Department.

 (c) Upon request, the operator shall provide a copy of the well-specific casing and cementing plan to the Department for review and approval.

 (d) Revisions to the plan made as a result of onsite modification shall be documented in the plan and be available for review by the Department. The person making the revisions to the plan shall initial and date the revisions.

§ 78.83b. Casing and cementing—lost circulation.

 (a) If cement used to permanently cement the surface or coal protective casing is not circulated to the surface despite pumping a volume of cement equal to or greater than 120% of the calculated annular space, the operator shall determine the top of the cement, notify the Department, and meet one of the following requirements as approved by the Department:

 (1) Run an additional string of casing at least 50 feet deeper than the string where circulation was lost and cement the additional string of casing back to the seat of the string where circulation was lost and vent the annulus of the additional casing string to the atmosphere at all times unless closed for well testing or maintenance. Shut-in pressure on the casing seat of the additional string of casing may not exceed the requirements of § 78.73(c) (relating to intermediate and production casing).

 (2) Run production casing and set the production casing on a packer in a competent formation below the string where circulation was lost and vent the annulus of the production casing to the atmosphere at all times unless closed for well testing or maintenance.

 (3) Run production casing at least to the top of the formation that is being produced and cement the production casing to the surface.

 (4) Run intermediate and production casing and cement both strings of casing to the surface.

 (5) Produce oil but not gas and leave the annulus between the surface casing and the production pipe open.

 (b) In addition to meeting the requirements of subsection (a), the operator may also pump additional cement through a pour string from the surface to fill the annular space.

§ 78.83c. Intermediate and production casing.

 (a) Prior to cementing the intermediate and production casing, the borehole, mud and cement shall be conditioned to ensure an adequate cement bond between the casing and the formation.

 (b) If the well is to be equipped with an intermediate casing, centralizers shall be used and the casing shall be cemented to the surface by the displacement method. Gas may be produced off the intermediate casing if a shoe test demonstrates that all gas will be contained within the well and a relief valve is installed at the surface that is set less than the shoe test pressure. The shoe test pressure shall be recorded in the completion report.

 (c) Except as provided in § 78.83 (relating to surface and coal protective casing and cementing procedures), each well must be equipped with production casing. The production string may be set on a packer or cemented in place. If the production casing is cemented in place, centralizers shall be used and cement shall be placed by the displacement method with sufficient cement to fill the annular space to a point at least 500 feet above true vertical depth or at least 200 feet above the uppermost perforations, whichever is greater.

§ 78.84. Casing standards.

 (a) The operator shall install casing that can withstand the effects of tension, and prevent leaks, burst and collapse during its installation, cementing and subsequent drilling and producing operations.

 (b) Except as provided in subsection (c), all casing must be a string of new pipe with an internal pressure rating that is at least 20% greater than the anticipated maximum pressure to which the casing will be exposed.

 (c) Used casing may be approved for use as surface, intermediate or production casing but shall be pressure tested after cementing and before continuation of drilling. A passing pressure test is holding the anticipated maximum pressure to which it will be exposed for 30 minutes with not more than a 10% decrease in pressure.

 (d) New or used plain end casing, except when being used as conductor pipe, that is welded together for use must meet the following requirements:

 (1) The casing must pass a pressure test by holding the anticipated maximum pressure to which the casing will be exposed for 30 minutes with not more than a 10% decrease in pressure. The operator shall notify the Department at least 24 hours before conducting the test. The test results shall be entered on the drilling log.

 (2) The casing shall be welded using at least three passes with the joint cleaned between each pass.

 (3) The casing shall be welded by a person trained and certified in the applicable American Petroleum Institute, American Society of Mechanical Engineers, American Welding Society or equivalent standard for welding casing and pipe or an equivalent training and certification program as approved by the Department. The certification requirements of this paragraph shall take effect August 5, 2011. A person with 10 or more years of experience welding casing as of February 5, 2011, who registers with the Department by November 7, 2011, is deemed to be certified.

 (e) When casing through a workable coal seam, the operator shall install coal protective casing that has a minimum wall thickness of 0.23 inch.

 (f) Casing which is attached to a blow-out preventer with a pressure rating of greater than 3,000 psi shall be pressure tested after cementing. A passing pressure test must be holding the anticipated maximum pressure to which the casing will be exposed for 30 minutes with not more than a 10% decrease. Certification of the pressure test shall be confirmed by entry and signature of the person performing the test on the driller's log.

§ 78.85. Cement standards.

 (a) When cementing surface casing or coal protective casing, the operator shall use cement that meets or exceeds the ASTM International C 150, Type I, II or III Standard or API Specification 10. The cement must also:

 (1) Secure the casing in the wellbore.

 (2) Isolate the wellbore from fresh groundwater.

 (3) Contain any pressure from drilling, completion and production.

 (4) Protect the casing from corrosion from, and degradation by, the geochemical, lithologic and physical conditions of the surrounding wellbore. For wells employing coal protective casing, this includes, but is not limited to, formulating cement to withstand elevated sulfate concentrations and other geochemical constituents of coal and associated strata which have the potential to adversely affect the integrity of the cement.

 (5) Prevent gas flow in the annulus. In areas of known shallow gas producing zones, gas block additives and low fluid loss slurries shall be used.

 (b) After the casing cement is placed behind surface casing, the operator shall permit the cement to set to a minimum designed compressive strength of 350 pounds per square inch (psi) at the casing seat. The cement placed at the bottom 300 feet of the surface casing must constitute a zone of critical cement and achieve a 72-hour compressive strength of 1,200 psi and the free water separation may be no more than 6 milliliters per 250 milliliters of cement. If the surface casing is less than 300 feet, the entire cemented string constitutes a zone of critical cement.

 (c) After any casing cement is placed and cementing operations are complete, the casing may not be disturbed for a minimum of 8 hours by doing any of the following:

 (1) Releasing pressure on the cement head within 4 hours of cementing if casing equipment check valves did not hold or casing equipment was not equipped with check valves. After 4 hours, the pressure may be released at a continuous, gradual rate over the next four hours provided the floats are secure.

 (2) Nippling up on or in conjunction to the casing.

 (3) Slacking off by the rig supporting the casing in the cement sheath.

 (4) Running drill pipe or other mechanical devices into or out of the wellbore with the exception of a wireline used to determine the top of cement.

 (d) Where special cement or additives are used, the operator may request approval from the Department to reduce the cement setting time specified in subsection (d).

 (e) The operator shall notify the Department a minimum of 1 day before cementing of the surface casing begins, unless the cementing operation begins within 72 hours of commencement of drilling.

 (f) A copy of the cement job log shall be available at the well site for inspection by the Department during drilling operations. The cement job log must include the mix water temperature and pH, type of cement with listing and quantity of additive types, the volume, yield and density in pounds per gallon of the cement and the amount of cement returned to the surface, if any. Cementing procedural information must include a description of the pumping rates in barrels per minute, pressures in pounds per square inch, time in minutes and sequence of events during the cementing operation.

 (g) The cement job log shall be maintained by the operator after drilling operations for at least 5 years and be made available to the Department upon request.

OPERATING WELLS

§ 78.88. Mechanical integrity of operating wells.

 (a) Except for wells regulated under Subchapter H (relating to underground gas storage) and wells that have been granted inactive status, the operator shall inspect each operating well at least quarterly to ensure it is in compliance with the well construction and operating requirements of this chapter and the act. The results of the inspections shall be recorded and retained by the operator for at least 5 years and be available for review by the Department and the coal owner or operator.

 (b) At a minimum, inspections must determine:

 (1) The well-head pressure or water level measurement.

 (2) The open flow on the annulus of the production casing or the annulus pressure if the annulus is shut in.

 (3) If there is evidence of gas escaping from the well and the amount escaping, using measurement or best estimate of quantity.

 (4) If there is evidence of progressive corrosion, rusting or other signs of equipment deterioration.

 (c) For structurally sound wells in compliance with § 78.73(c) (relating to surface and coal protective casing and cementing procedure), the operator shall follow the reporting schedule outlined in subsection (e).

 (d) For wells exhibiting progressive corrosion, rusting or other signs of equipment deterioration that compromise the integrity of the well, or the well is not in compliance with § 78.73(c), the operator shall immediately notify the Department and take corrective actions to repair or replace defective equipment or casing or mitigate the excess pressure on the surface casing seat or coal protective casing seat according to the following hierarchy:

 (1) The operator shall reduce the shut-in or producing back pressure on the casing seat to achieve compliance with § 78.73(c).

 (2) The operator shall retrofit the well by installing production casing to reduce the pressure on the casing seat to achieve compliance with § 78.73(c). The annular space surrounding the production casing must be open to the atmosphere. The production casing shall be either cemented to the surface or installed on a permanent packer. The operator shall notify the Department at least 7 days prior to initiating the corrective measure.

 (3) Additional mechanical integrity tests, including, but not limited to, pressure tests, may be required by the Department to demonstrate the integrity of the well.

 (e) The operator shall submit an annual report to the Department identifying the compliance status of each well with the mechanical integrity requirements of this section. The report shall be submitted on forms prescribed by, and available from, the Department or in a similar manner approved by the Department.

§ 78.89. Gas migration response.

 (a) When an operator or owner is notified of or otherwise made aware of a potential natural gas migration incident, the operator shall immediately conduct an investigation of the incident. The purpose of the investigation is to determine the nature of the incident, assess the potential for hazards to public health and safety, and mitigate any hazard posed by the concentrations of stray natural gas.

 (b) The investigation undertaken by the operator under subsection (a) must include, but not be limited to, the following:

 (1) A site visit and interview with the complainant to obtain information about the complaint and to assess the reported natural gas migration incident.

 (2) A field survey to assess the presence and concentrations of natural gas and aerial extent of the stray natural gas.

 (3) If necessary, establishment of monitoring locations at potential sources, in potentially impacted structures, and the subsurface.

 (c) If combustible gas is detected inside a building or structure at concentrations equal to or greater than 10% of the L.E.L., the operator shall do the following:

 (1) Immediately notify the Department, local emergency response agency, gas and electric utility companies, police and fire departments and, in conjunction with the Department and local emergency response agencies, take measures necessary to ensure public health and safety.

 (2) Initiate mitigation measures necessary to control and prevent further migration.

 (3) Implement the additional investigation and mitigation measures as provided in subsection (e)(1)—(5).

 (d) The operator shall notify the Department and, in conjunction with the Department, take measures necessary to ensure public health and safety, if sustained detectable concentrations of combustible gas satisfy any of the following:

 (1) Greater than 1% and less than 10% of the L.E.L., in a building or structure.

 (2) Equal to or greater than 25% of the L.E.L. in a water well head space.

 (3) Detectable in the soils.

 (4) Equal to or greater than 7 mg/l dissolved methane in water.

 (e) The Department may require the operator to take the following additional actions:

 (1) Conduct a field survey to assess the presence and concentrations of combustible gas and the areal extent of the combustible gas in the soils, surface water bodies, water wells, and other potential migration pathways.

 (2) Collect gas or water, or both, samples at a minimum for molecular and stable carbon and hydrogen isotope analyses from the impacted locations such as water wells, and from potential sources of the migration such as gas wells.

 (3) Conduct an immediate evaluation of the operator's adjacent oil or gas wells to determine well cement and casing integrity and to evaluate the potential mechanism of migration. This evaluation may include assessing pressures for all casing intervals, reviewing records for indications of defective casing or cement, application of cement bond logs, ultrasonic imaging tools, geophysical logs, and other mechanical integrity tests as required. The initial area of assessment must include wells within a radius of 2,500 feet and may be expanded if required by the Department.

 (4) Take action to correct any defect in the oil and gas wells to mitigate the stray gas incident.

 (5) Establish monitoring locations and monitoring frequency in consultation with the Department at potential sources, in potentially impacted structures, and the subsurface.

 (f) If concentrations of stray natural gas as defined in subsection (c) or (d) are not detected, the operator shall notify the Department, and do the following if requested by the Department:

 (1) Conduct additional monitoring.

 (2) Document findings.

 (3) Submit a closure report.

 (g) If concentrations of stray natural gas are detected inside a building or structure at concentrations equal to or greater than 10% of the L.E.L., the operator and owner shall file a report with the Department by phone and email within 24 hours after the interview with the complainant and field survey of the extent of stray natural gas. Additional daily or weekly reports shall be submitted if requested by the Department.

 (h) For all stray natural gas migration incidents, a final written report documenting the results of the investigation shall be submitted to the Department for approval within 30 days of the close of the incident, or in a time frame otherwise approved by the Department. The final report must include the following:

 (1) Documentation of all results of the investigation, including analytical data and monitoring results.

 (2) Operational changes established at the operator's oil and gas wells in this Commonwealth.

 (3) Measures taken by the operator to repair any defects at any of the investigated oil and gas wells.

 (i) Reports submitted in accordance with this section that contain an analysis of geological or engineering data shall be prepared and sealed by a geologist or engineer licensed in this Commonwealth.

PLUGGING

§ 78.92. Wells in coal areas—surface or coal protective casing is cemented.

 (a) In a well underlain by a workable coal seam, where the surface casing or coal protective casing is cemented and the production casing is not cemented or the production casing is not present, the owner or operator shall plug the well as follows:

 (1) The retrievable production casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The well shall be filled with nonporous material from the total depth or attainable bottom of the well, to a point 50 feet below the lowest stratum bearing or having borne oil, gas or water. At this point there shall be placed a plug of cement, which shall extend for at least 50 feet above this stratum. Each overlying formation bearing or having borne oil, gas or water shall be plugged with cement a minimum of 50 feet below this formation to a point 50 feet above this formation. The zone between cement plugs shall be filled with nonporous material. The cement plugs shall be placed in a manner that will completely seal the hole. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials approved by the Department. Where the production casing is not retrievable, the operator shall plug that portion of the well under § 78.91(d) (relating to general provisions).

 (2) After plugging strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to a point approximately 100 feet below the surface or coal protective casing seat, whichever is deeper. At this point, a 100-foot plug of cement shall be installed.

 (3) After the plug has been installed below the casing seat, the inner casing shall be emptied of liquid from the surface to the plug of cement. A vent or other device approved by the Department shall then be installed on top of the inner string of casing to prevent liquids and solids from entering the well but permit access to the full internal diameter of the inner casing when required. The vent or other device approved by the Department must extend, when finally in place, a distance of at least 72 inches above ground level and the permit or registration number must be permanently affixed.

 (b) The owner or operator shall plug a well, where the surface casing, coal protective casing and production casing are cemented, as follows:

 (1) If the total depth or attainable bottom is deeper than the cemented production casing seat, the operator shall plug that portion of the well under subsection (a)(1).

 (2) Cement plugs shall be set in the cemented portion of the production casing so that the plugs will extend from at least 50 feet below each stratum bearing or having borne oil, gas or water, to a point at least 100 feet above each stratum bearing or having borne, oil, gas or water. A Department-approved mechanical plug may be set 20 feet above each stratum bearing or having borne oil, gas or water as a substitute for the plug of cement. Nonporous material must separate each cement plug or mechanical plug. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials as approved by the Department.

 (3) Following the plugging of the cemented portion of the production casing, the uncemented portion of the production casing shall be separated from the cemented portion and retrieved by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The maximum distance the stub of the uncemented portion of the production casing may extend is 100 feet below the surface or coal protective casing whichever is lower. In no case may the uncemented portion of the casing left in the well extend through a formation bearing or having borne oil, gas or water. Other stratum above the cemented portion of the production casing bearing or having borne oil, gas or water shall be plugged by filling the hole with nonporous material to 20 feet above the stratum and setting a 50-foot plug of cement. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other material as approved by the Department. When the uncemented portion of the production casing is not retrievable, the operator shall plug that portion of the well under § 78.91(d).

 (4) After plugging all strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to a point approximately 100 feet below the surface or coal protective casing seat, whichever is deeper. At this point a 200-foot cement plug shall be placed so that the plug extends from 100 feet below the casing seat to a point at least 100 feet above the casing seat.

 (5) After the 200-foot plug has been installed, the remainder of the well shall be plugged and vented as described in subsection (a)(3).

 (c) A person authorized by the Department under the act or section 13 of the Coal and Gas Resource Coordination Act (58 P. S. § 513) to plug a gas well that penetrates a workable coal seam that was drilled prior to November 30, 1955, or which was permitted after that date but not plugged in accordance with the act, shall plug the well to mine through it in the following manner:

 (1) The gas well shall be cleaned out to a depth of at least 200 feet below the coal seam which is proposed to be mined and, unless impracticable, to a point 200 feet below the deepest mineable coal seam that the well penetrates.

 (2) The gas well shall be plugged in accordance with section 13(a)(1), (2), (3) or (4) of the Coal and Gas Re- source Coordination Act.

§ 78.93. Wells in coal areas—surface or coal protective casing anchored with a packer or cement.

 (a) In a well where the surface casing or coal protective casing and production casing are anchored with a packer or cement, the owner or operator shall plug the well as follows:

 (1) The retrievable production casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The well shall be filled with nonporous material from the total depth or attainable bottom of the well, to a point 50 feet below the lowest stratum bearing or having borne oil, gas or water. At this point there shall be placed a plug of cement, which must extend for at least 50 feet above this stratum. Each overlying formation bearing or having borne oil, gas or water shall be plugged with cement a minimum of 50 feet below this formation to a point 50 feet above this formation. The zone between cement plugs shall be filled with nonporous material. The cement plugs shall be placed in a manner that will completely seal the hole. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other material as approved by the Department. When the production casing is not retrievable, the operator shall plug this portion of the well under § 78.91(d) (relating to general provisions).

 (2) The well shall then be filled with nonporous material to a point approximately 200 feet below the lowest workable coal seam, or surface or coal protective casing seat, whichever is deeper. Beginning at this point a 100-foot plug of cement shall be installed.

 (3) After it has been established that the surface casing or coal protective casing is free and can be retrieved, the surface or coal protective casing shall be retrieved by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. A string of casing with an outside diameter of at least 4 1/2 inches for gas wells, or at least 2 inches for oil wells, shall be run to the top of the 100-foot plug described in paragraph (2) and cemented to the surface.

 (4) If the surface or coal protective string is not free and cannot be retrieved, it shall be perforated or cut below the lowest workable coal to allow the cement used to cement the 4 1/2-inch or 2-inch casing to communicate between the surface casing or coal protective casing, or both, and the well bore. A string of casing of at least 4 1/2 inches for gas wells or at least 2 inches for oil wells shall be run to the top of the 100-foot plug described in paragraph (2) and cemented to the surface.

 (5) The inner casing shall then be emptied of liquid and cement from the base of the casing to the surface and a vent or other device approved by the Department shall be installed on the top of the casing to prevent liquids and solids from entering the well, but permit ready access to the full internal diameter of the inner casing. The inner string of casing and the vent or other device approved by the Department must extend, when finally in place, a distance of at least 72 inches above ground level and the permit or registration number must be permanently affixed to the vent.

*  *  *  *  *

§ 78.94. Wells in noncoal areas—surface casing is not cemented or not present.

 (a) The owner or operator shall plug a noncoal well, where the surface casing and production casing are not cemented, or is not present as follows:

 (1) The retrievable production casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The well shall be filled with nonporous material from the total depth or attainable bottom of the well, to a point 50 feet below the lowest stratum bearing or having borne oil, gas or water. At this point there shall be placed a plug of cement, which must extend for at least 50 feet above this stratum. Each overlying formation bearing or having borne oil, gas or water shall be plugged with cement a minimum of 50 feet below this formation to a point 50 feet above this formation. The zone between cement plugs shall be filled with nonporous material. The cement plugs shall be placed in a manner that will completely seal the hole. The operator may treat multiple strata as one stratum and plug as described in this paragraph with a single column of cement or other materials as approved by the Department. When the production casing is not retrievable, the operator shall plug this portion of the well under § 78.91(d) (relating to general provisions).

 (2) After plugging strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to approximately 100 feet below the surface casing seat and there shall be placed another plug of cement or other equally nonporous material approved by the Department extending at least 50 feet above that point.

 (3) After setting the uppermost 50-foot plug, the retrievable surface casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The hole shall be filled from the top of the 50-foot plug to the surface with nonporous material other than gel. If the surface casing is not retrievable, the hole shall be filled from the top of the 50-foot plug to the surface with a noncementing material.

 (b) The owner or operator shall plug a well, where the surface casing is not cemented or not present, and the production casing is cemented as follows:

 (1) If the total depth or attainable bottom is deeper than the cemented production casing seat, the operator shall plug that portion of the well under subsection (a)(1).

 (2) Cement plugs shall be set in the cemented portion of the production casing so that each plug extends from at least 50 feet below each stratum bearing or having borne oil, gas or water, to a point at least 100 feet above each stratum. A Department-approved mechanical plug may be used as a substitute for the plug of cement. The mechanical plug shall be set 20 feet above each stratum having borne oil, gas or water. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other material approved by the Department.

 (3) Following the plugging of the cemented portion of the production casing, the uncemented portion of the production string shall be separated from the cemented portion and retrieved. The maximum distance the stub of the uncemented portion of the production casing may extend is 100 feet below the surface casing. In no case may the uncemented portion of the production casing left in the hole extend through stratum bearing or having borne oil, gas or water. Other stratum bearing or having borne oil, gas or water shall be plugged by filling the hole with nonporous material to 20 feet above the stratum and setting a 50-foot plug of cement. When the uncemented portion of the production casing is not retrievable, the operator shall plug that portion of the well under § 78.91(d).

 (4) The remainder of the well shall be plugged under subsection (a)(2) and (3).

§ 78.95. Wells in noncoal areas—surface casing is cemented.

 (a) The owner or operator shall plug a well, where the surface casing is cemented and the production casing is not cemented or not present, as follows:

 (1) The retrievable production casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The well shall be filled with nonporous material from the total depth or attainable bottom of the well, to a point 50 feet below the lowest stratum bearing or having borne oil, gas or water. At this point there shall be placed a plug of cement, which extends for at least 50 feet above this stratum. Each overlying formation bearing or having borne oil, gas or water shall be plugged with cement a minimum of 50 feet below this formation to a point 50 feet above this formation. The zone between cement plugs shall be filled with nonporous material. The cement plugs shall be placed in a manner that will completely seal the hole. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials as approved by the Department. When the production casing is not retrievable, the operator shall plug this portion of the well under § 78.91(d) (relating to general provisions).

 (2) After plugging all strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to approximately 100 feet below the surface casing seat. Another plug of cement, or other equally nonporous material approved by the Department, shall be placed extending at least 50 feet above that point.

 (3) After setting the 50-foot plug, the hole shall be filled from the top of the 50-foot plug to the surface with a noncementing material or the operator shall set a 100-foot cement plug which extends 50-feet into the surface casing and fill the hole to the surface with noncementing material.

 (b) The owner or operator shall plug a noncoal well, where the surface casing and production casing are cemented, as follows:

 (1) If the total depth or attainable bottom is deeper than the cemented production casing seat, the operator shall plug that portion of the well under subsection (a)(1).

 (2) Cement plugs shall be set in the cemented portion of the production casing so that each plug extends from at least 50 feet below each stratum bearing or having borne oil, gas or water, to a point at least 100 feet above the stratum. A Department-approved mechanical plug may be used as a substitute for the plug of cement. The mechanical plug shall be set 20 feet above each stratum having borne oil, gas or water. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials approved by the Department.

 (3) Following the plugging of the cemented portion of the production casing, the uncemented portion of the production string shall be separated from the cemented portion and retrieved. The maximum distance the stub of the uncemented portion of the production casing may extend is 100 feet below the surface casing. In no case may the uncemented portion of the production casing left in the hole extend through stratum bearing or having borne oil, gas or water. Other stratum bearing or having borne oil, gas or water shall be plugged by filling the hole with nonporous material to 20 feet above the stratum and setting a 50-foot plug of cement. When the uncemented portion of the production casing is not retrievable, the operator shall plug that portion of the well under § 78.91(d).

 (4) The remainder of the well shall be plugged under subsection (a)(2) and (3).

§ 78.96. Marking the location of a plugged well.

 Upon the completion of plugging or replugging a well, the operator shall erect over the plugged well a permanent marker of concrete, metal, plastic or equally durable material. The marker must extend at least 4 feet above the ground surface and enough below the surface to make the marker permanent. Cement may be used to hold the marker in place provided the cement does not prevent inspection of the adequacy of the well plugging. The permit or registration number shall be stamped or cast or otherwise permanently affixed to the marker. In lieu of placing the marker above the ground surface, the marker may be buried below plow depth and shall contain enough metal to be detected at the surface by conventional metal detectors

Subchapter E. WELL REPORTING

§ 78.121. Production reporting.

 (a) The well operator shall submit an annual production and status report for each permitted or registered well on an individual basis, on or before February 15 of each year. The operator of a well permitted to produce gas from the Marcellus shale formation shall submit a production and status report for each well on an individual basis, on or before February 15 and August 15 of each year. Production shall be reported for the preceding calendar year or in the case of a Marcellus shale well, for the preceding 6 months. When the production data is not available to the operator on a well basis, the operator shall report production on the most well-specific basis available. The annual production report must include information on the amount and type of waste produced and the method of waste disposal or reuse. Waste information submitted to the Department in accordance with this subsection is deemed to satisfy the residual waste biennial reporting requirements of § 287.52 (relating to biennial report).

 (b) The production report shall be submitted electronically to the Department through its web site.

§ 78.122. Well record and completion report.

 (a) For each well that is drilled or altered, the operator shall keep a detailed drillers log at the well site available for inspection until drilling is completed. Within 30 calendar days of cessation of drilling or altering a well, the well operator shall submit a well record to the Department on a form provided by the Department that includes the following information:

 (1) Name, address and telephone number of the permittee.

 (2) Permit number, and farm name and number.

 (3) Township and county.

 (4) Date drilling started and completed.

 (5) Method of drilling.

 (6) Size and depth of conductor pipe, surface casing, coal protective casing, intermediate casing, production casing and borehole.

 (7) Type and amount of cement and results of cementing procedures.

 (8) Elevation and total depth.

 (9) Drillers log that includes the name and depth of formations from the surface to total depth, depth of oil and gas producing zone, depth of fresh water and brines and source of information.

 (10) Certification by the operator that the well has been constructed in accordance with this chapter and any permit conditions imposed by the Department.

 (11) Other information required by the Department.

 (b) Within 30 calendar days after completion of the well, the well operator shall submit a completion report to the Department on a form provided by the Department that includes the following information:

 (1) Name, address and telephone number of the permittee.

 (2) Name, address and telephone number of the service companies.

 (3) Permit number and farm name and number.

 (4) Township and county.

 (5) Perforation record.

 (6) Stimulation record which includes the following:

 (i) A descriptive list of the chemical additives in the stimulation fluid, including any acid, biocide, breaker, brine, corrosion inhibitor, crosslinker, demulsifier, friction reducer, gel, iron control, oxygen scavenger, pH adjusting agent, proppant, scale inhibitor and surfactant.

 (ii) The percent by volume of each chemical additive in the stimulation fluid.

 (iii) A list of the chemicals in the Material Safety Data Sheets, by name and chemical abstract service number, corresponding to the appropriate chemical additive.

 (iv) The percent by volume of each chemical listed in the Material Safety Data Sheets.

 (v) The total volume of the base fluid.

 (vi) A list of water sources used under an approved water management plan and the volume of water used from each source.

 (vii) The total volume of recycled water used.

 (viii) The pump rate and pressure used in the well.

 (7) Actual open flow production and shut in surface pressure.

 (8) Open flow production and shut in surface pressure, measured 24 hours after completion.

 (c) When the well operator submits a stimulation record, it may designate specific portions of the stimulation record as containing a trade secret or confidential proprietary information. The Department will prevent disclosure of the designated confidential information to the extent permitted under the Right-to-Know Law (65 P. S. §§ 67.101—67.3103).

 (d) In addition to submitting a stimulation record to the Department under subsection (b), and subject to the protections afforded for trade secrets and confidential proprietary information under the Right-to-Know Law, the operator shall arrange to provide a list of the chemical constituents of the chemical additives used to hydraulically fracture a well, by chemical name and abstract service number, unless the additive does not have an abstract service number, to the Department upon written request by the Department.

[Pa.B. Doc. No. 11-239. Filed for public inspection February 4, 2011, 9:00 a.m.]