Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Bulletin website includes the following: Rulemakings by State agencies; Proposed Rulemakings by State agencies; State agency notices; the Governor’s Proclamations and Executive Orders; Actions by the General Assembly; and Statewide and local court rules.

PA Bulletin, Doc. No. 21-895c

[51 Pa.B. 3143]
[Saturday, June 5, 2021]

[Continued from previous Web Page]

ACTIONS ON COAL AND NONCOAL MINING ACTIVITY APPLICATIONS


Actions on applications under the Surface Mining Conservation and Reclamation Act (52 P.S. §§ 1396.1—1396.31); the Noncoal Surface Mining Conservation and Reclamation Act (52 P.S. §§ 3301—3326); the Clean Streams Law (35 P.S. §§ 691.1—691.1001); the Coal Refuse Disposal Control Act (52 P.S. §§ 30.51—30.66); the Bituminous Mine Subsidence and Land Conservation Act (52 P.S. §§ 1406.1—1406.21). The final action on each application also constitutes action on the NPDES permit application and, if noted, the request for a Section 401 Water Quality Certification. Mining activity permits issued in response to such applications will also address the application permitting requirements of the following statutes; the Air Quality Control Act (35 P.S. §§ 4001—4015); the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27); and the Solid Waste Management Act (35 P.S. §§ 6018.101—6018.1003).

Coal Permits Issued

Cambria District Mining Office: 286 Industrial Park Road, Ebensburg, PA 15931, 814-472-1900, (Contact: Melanie Ford-Wigfield).

Permit No. 56140103 and NPDES No. PA0279315. Fieg Brothers, P.O. Box 38, Berlin, PA 15530, renewal of a bituminous surface and auger mine in Southampton and Fairhope Townships, Somerset County, affecting 291.3 acres. Receiving streams: unnamed tributaries to Wills Creek to Potomac River classified for the following use: high-quality cold-water fishes. There are no potable water supply intakes within 10 miles downstream. Application received: February 9, 2021. Permit issued: May 19, 2021.

Permit No. 56140104 and NPDES No. PA0279636. Fieg Brothers, P.O. Box 38, Berlin, PA 15530, renewal of a bituminous surface and auger mine in Brothersvalley Township, Somerset County, affecting 79.5 acres. Receiving streams: unnamed tributaries to/and Buffalo Creek and Buffalo Creek to Casselman River classified for the following uses: cold water fishes and warm water fishes. The first downstream potable water supply intake from the point of discharge is Youghiogheny River. Application received: February 9, 2021. Permit issued: May 19, 2021.

Moshannon District Mining Office: 186 Enterprise Drive, Philipsburg, PA 16866, 814-342-8200, (Contact: Ashley Smith).

Permit No. 17090102 and NPDES PA0257052. RES Coal LLC, 224 Grange Hall Road, P.O. Box 228, Armagh, PA 15920. Permit renewal for reclamation only of a bituminous surface mine in Decatur Township, Clearfield County affecting 259.4 acres. Receiving stream(s): Little Laurel Run to Moshannon Creek classified for the following use(s): CWF, MF. There are no potable water supply intakes within 10 miles downstream. Application received: December 7, 2020. Permit issued: May 13, 2021.

Permit No. 17120101 and NPDES PA0257893. RES Coal LLC, 224 Grange Hall Road, P.O. Box 228, Armagh, PA 15920. Permit renewal for continued operation and restoration of a bituminous surface coal mine located in Ferguson Township, Clearfield County affecting 55.0 acres. Receiving stream(s): Unnamed Tributaries to West Branch Susquehanna River to West Branch Susquehanna River classified for the following use(s): CWF and WWF. There are no potable water supply intakes within 10 miles downstream. Application received: November 4, 2020. Permit issued: May 13, 2021.

New Stanton District Office: P.O. Box 133, New Stanton, PA 15672, 724-925-5500, (Contact: Tracy Norbert).

Contract No. 26-19-01 and NPDES Permit No. PA0278475. Stash Mining, LLC, 675 Old Route 51, Waltersburg, PA 15488. Government Financed Construction Contract issued for reclamation of approximately 14.0 acres of abandoned mine lands located in Franklin Township, Fayette County. Receiving streams: unnamed tributary to Redstone Creek. Application received: July 17, 2020. Contract issued: May 20, 2021.

Noncoal Permits Issued

Cambria District Mining Office: 286 Industrial Park Road, Ebensburg, PA 15931, 814-472-1900, (Contact: Melanie Ford-Wigfield).

Permit No. 44030302 and NPDES Permit No. PA0224294, Glenn O. Hawbaker, Inc., 1952 Waddle Road, State College, PA 16803, renewal of an NPDES permit, located in Armagh Township, Mifflin County. Receiving stream: Honey Creek, classified for the following use: high-quality cold-water fishes. There are no potable water supply intakes within 10 miles downstream. Application received: February 16, 2021. Permit issued: May 19, 2021.

New Stanton District Office: P.O. Box 133, New Stanton, PA 15672, 724-925-5500, (Contact: Tracy Norbert).

Permit No. 63100401 and NPDES Permit No. PA0252034. Neiswonger Construction, Inc., 17592 Route 322, Strattanville, PA 16258. Revision application to add 5.9 acres to the surface mine permit for an additional 3 acres of mining to an existing bituminous noncoal surface mine, located in Deemston Borough, Washington County, affecting 74.2 acres. Receiving streams: unnamed tributaries to Ten Mile Creek and Ten Mile Creek, classified for the following use: TSF. Tri-County Joint Municipal Authority is the potable water supply intake within 10 miles downstream from the point of discharge. Application received: January 30, 2020. Permit revision issued: May 20, 2021.

Pottsville District Mining Office: 5 West Laurel Boulevard, Pottsville, PA 17901, 570-621-3118, (Contact: Theresa Reilly-Flannery).

Permit No. 7976SM1C11 and NPDES Permit No. PA0118389. Eureka Stone Quarry, Inc., P.O. Box 249, Chalfont, PA 18914, renewal of an NPDES Permit for discharge of treated mine drainage from a quarry operation in Warrington Township, Bucks County. Receiving stream: unnamed tributary to Neshaminy Creek. Application received: August 16, 2019. Renewal issued: May 18, 2021.

ACTIONS ON BLASTING ACTIVITY APPLICATIONS


Actions on applications under the Explosives Acts of 1937 and 1957 and 25 Pa. Code § 211.124. Blasting activity performed as part of a coal or noncoal mining activity will be regulated by the mining permit for that coal or noncoal mining activity.

Blasting Permits Issued

Moshannon District Mining Office: 186 Enterprise Drive, Philipsburg, PA 16866, 814-342-8200, (Contact: Ashley Smith).

Permit No. 08214105. M & J Explosives, LLC, 104 East Main Street, Carlisle, PA 17015. Blasting for construction of the SGL-12 L South Gas Well Pad located in Leroy Township, Bradford County with an expiration date of May 18, 2022. Permit issued: May 19, 2021.

Permit No. 08214104. M & J Explosives, LLC, 104 East Main Street, Carlisle, PA 17015. Blasting for construction of the SGL-12 L&M Well Pad Borrow Pit located in Leroy Township, Bradford County with an expiration date of May 18, 2022. Permit issued: May 21, 2021.

Pottsville District Mining Office: 5 West Laurel Boulevard, Pottsville, PA 17901, 570-621-3118, (Contact: Theresa Reilly-Flannery).

Permit No. 52214101. Explosive Services, Inc., 7 Pine Street, Bethany, PA 18431, construction blasting for SR 2001 Road Safety Project in Delaware and Lehman Townships, Pike County with an expiration date of May 14, 2022. Permit issued: May 19, 2021.

Permit No. 40214110. Hayduk Enterprises, Inc., 257 Riverside Drive, Factoryville, PA 18419, construction blasting for Hazleton Business Park in the City of Hazleton, Luzerne County with an expiration date of September 30, 2021. Permit issued: May 20, 2021.

FEDERAL WATER POLLUTION CONTROL ACT SECTION 401

 The Department has taken the following actions on previously received permit applications, requests for Environmental Assessment approval, and requests for Water Quality Certification under Section 401 of the Federal Water Pollution Control Act (FWPCA) (33 U.S.C.A. § 1341).

 Except as otherwise noted, the Department has granted 401 Water Quality Certification certifying that the construction and operation described will comply with the applicable provisions of Sections 301—303, 306 and 307 of the FWPCA (33 U.S.C.A. §§ 1311—1313, 1316 and 1317), and that the construction will not violate applicable Federal and State Water Quality Standards.

 Any person aggrieved by these actions may appeal, pursuant to Section 4 of the Environmental Hearing Board Act, 35 P.S. Section 7514, and the Administrative Agency Law, 2 Pa.C.S. Chapter 5A, to the Environmental Hearing Board, Second Floor, Rachel Carson State Office Building, 400 Market Street, P.O. Box 8457, Harrisburg, PA 17105-8457, (717) 787-3483. TDD users may contact the Board through the Pennsylvania Hamilton Relay Service, (800) 654-5984. Appeals must be filed with the Environmental Hearing Board within 30-days of publication of this notice in the Pennsylvania Bulletin, unless the appropriate statute provides a different time period. Copies of the appeal form and the Board's rules of practice and procedure may be obtained from the Board. The appeal form and the Board's rules of practice and procedure are also available in braille or on audiotape from the Secretary to the Board at (717) 787-3483. This paragraph does not, in and of itself, create any right of appeal beyond that permitted by applicable statutes and decisional law.

 If you want to challenge this action, your appeal must reach the Board within 30-days. You do not need a lawyer to file an appeal with the Board.

 Important legal rights are at stake, however, so you should show this notice to a lawyer at once. If you cannot afford a lawyer, you may qualify for free pro bono representation. Call the Secretary to the Board (717) 787-3483 for more information.

WATER OBSTRUCTIONS AND ENCROACHMENTS


Actions on applications for the following activities filed under the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27), section 302 of the Flood Plain Management Act (32 P.S. § 679.302) and The Clean Streams Law and Notice of Final Action for Certification under section 401 of the FWPCA.


Southwest Region: Oil and Gas Management Program Manager 400 Waterfront Drive, Pittsburgh, PA 15222, (412) 442-4281.

E0207220-038; ETC Northeast Pipeline, LLC, 6051 Wallace Road Extension, Third Floor, Wexford, PA 15090, Findlay Township, Allegheny County, Center, Conway, Independence, New Sewickley, Racoon Township(s), Beaver County, Jackson Township, Butler County, Robinson, Smith Townships, Washington County, ACOE Pittsburgh District.

 The Revolution Pipeline project was originally permitted to install a 40.5-mile-long, 24-inch diameter steel natural gas pipeline that connects wells in Butler and Beaver counties to a natural gas processing facility in Washington County, PA. This application is for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities.

 The project is located within the Aliquippa, Baden, Beaver, Clinton, Evans City and Zelienople USGS 7 1/2 Minute Quadrangle Map.

 See E0407220-023; E1007220-026 and E6307220-027 for additional impacts associated with this project.

 On December 12, 2020, the Department of Environmental Protection published the receipt of an application for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities in the Pennsylvania Bulletin [50 Pa.B. 7028]. This public notice was pursuant to 25 Pa. Code Chapter 105.21a. The December 12, 2020 notice appeared under a heading related to Chapter 102 of the Department's regulations. However, this application was received Under the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27), Section 302 of the Flood Plain Management Act (32 P.S. § 679.302), and Requests for Certification under Section 401 of the Federal Water Pollution Control Act (33 U.S.C.A. § 1341(a)).

Nearest
Station Location
Structure/
Activity
Unique
Identifier
Aquatic Resource Type Latitude dd nad83 Longitude
dd nad83
Waters Name Pa. Code Chapter 93 Designation Work Proposed(1) DEP Impact Type Temp/
Perm
Watercourse
Impact Linear foot
(along channel) x Width (Top of Banks)
Length and Width (feet)
Floodway Impact Top of Bank Landward

Length and Width (feet) Area (square feet)
Wetland Impact

Length and Width (feet) Area (square feet)
TAR 1803+00 GP-ACCESS-
Stream 77-1
Intermittent 40.481934 -80.347035 UNT to Trib 33757 to Potato Garden Run WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 26 x 1 ft.
26 s.f.
100 x 57 ft. 5,700 s.f. NA
1817+00 Stream 9-127 Ephemeral 40.477837 -80.344343 UNT to Potato Garden Run WWF Grading w/in stream channel and floodway for restoration Temp 13 x 5 ft.
40 s.f.
31 x 14 ft. 217 s.f. NA
1821+00 Stream 9-128 # 3 Perennial 40.476953 -80.344278 Potato Garden Run WWF Slope Repair Temp 0 83 x 11 ft. 417 s.f. NA
1821+00 OUT-Stream 9-128 Perennial 40.476356 -80.343834 Potato Garden Run WWF Outfall Perm 0 4 x 8 ft.
32 s.f.
NA
1823+00 Stream 9-128 # 1 Perennial 40.476368 -80.343551 Potato Garden Run WWF Slope Repair Temp 100 x 12 ft.
1211 s.f.
160 x 30 ft. 5180 s.f. NA
1823+00 Stream 9-128 # 2 Perennial 40.476338 -80.343630 Potato Garden Run WWF Vegetated Riprap Perm 5 x 124 ft.
618 s.f.
20 x 141 ft. 2,830 s.f. NA
1822+00 GP-ACCESS-
Stream 9-128
Perennial 40.476691 -80.344040 Potato Garden Run WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 48 x 20 ft.
819 s.f.
231 x 20 ft. 4,292 s.f. NA
1842+60 Wetland W-20200414-
1417-CWI-A
PEM 40.473019 -80.340172 NA NA Grading w/in wetland for restoration Temp NA NA 54 x 24 ft. 566 s.f.
1843+00 Stream 11-33 Ephemeral 40.472979 -80.340132 UNT to Potato Garden Run WWF Grading w/in stream channel and floodway for restoration Temp 22 x 4 ft.
86 s.f.
14 x 6 ft.
41 s.f.
NA
1843+00 Stream 13-4 Ephemeral 40.473128 -80.340158 UNT to Potato Garden Run WWF Grading w/in stream channel and floodway for restoration Temp 97 x 1 ft.
97 s.f.
89 x 81 ft. 4,856 s.f. NA
1843+00 Stream 11-32 Perennial 40.473104 -80.339778 UNT to Potato Garden Run WWF Temporary Disturbance for Bank Stabilization and Pump Around Discharge Temp 62 x 12 ft. 531 s.f. 126 x 101 ft. 6,098 s.f. NA

E0407220-023 ETC Northeast Pipeline, LLC, 6051 Wallace Road Extension, Third Floor, Wexford, PA 15090, Findlay Township, Allegheny County, Center, Conway, Independence, New Sewickley, Racoon Township(s), Beaver County, Jackson Township, Butler County, Robinson, Smith Townships, Washington County, ACOE Pittsburgh District.

 The Revolution Pipeline project was originally permitted to install a 40.5-mile-long, 24-inch diameter steel natural gas pipeline that connects wells in Butler and Beaver counties to a natural gas processing facility in Washington County, PA. This application is for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities.

 The project is located within the Aliquippa, Baden, Beaver, Clinton, Evans City and Zelienople USGS 7 1/2 Minute Quadrangle Map.

 See E0207220-038; E1007220-026 and E6307220-027 for additional impacts associated with this project.

 On December 12, 2020, the Department of Environmental Protection published the receipt of an application for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities in the Pennsylvania Bulletin [50 Pa.B. 7028]. This public notice was pursuant to 25 Pa. Code Chapter 105.21a. The December 12, 2020 notice appeared under a heading related to Chapter 102 of the Department's regulations. However, this application was received Under the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27), Section 302 of the Flood Plain Management Act (32 P.S. § 679.302), and Requests for Certification under Section 401 of the Federal Water Pollution Control Act (33 U.S.C.A. § 1341(a)).

Nearest
Station Location
Structure/
Activity
Unique
Identifier
Aquatic Resource Type Latitude dd nad83 Longitude dd nad83 Waters Name Pa. Code Chapter 93 Designation Work Proposed(1) DEP, Impact Type Temp/
Perm
Watercourse Impact Linear foot (along channel) x Width (Top of Banks) Length and Width (feet) Floodway Impact Top of Bank Landward

Length and Width (feet) Area (square feet)
Wetland Impact

Length and Width (feet) Area (square feet)
371+00 ACCESS-
Wetland 25-H
PEM 40.735009 -80.152566 NA NA Temporary equipment access >200ft Temp NA NA 414 x 20 ft. 7,144 s.f.
371+00 Wetland 25-H PEM 40.735243 -80.152234 NA NA Waterbar Removal Temp NA NA 67 x 15 ft. 945 s.f.
388+00 Wetland W-20200423-
1005-CWI
PEM 40.731817 -80.155131 NA NA Waterbar Removal Temp NA NA 46 x 15 ft. 535 s.f.
396+00 Wetland 10-G # 1 PSS 40.730960 -80.157992 NA NA Temporary Disturbance for Perimeter Erosion Control for Abutting Restoration Temp NA NA 7 x 285 ft. 871 s.f.
394+20 GP-ACCESS-
Wetland 10-G # 2
PEM 40.731132 -80.157488 NA NA GP-8 Temporary equipment crossing (timber mat) Temp NA NA 21 x 12 ft. 190 s.f.
396+00 Stream 9-94 Perennial 40.731137 -80.157849 UNT 34822 to Brush Creek WWF Grading w/in floodway for restoration Temp 0 155 x 32 ft. 3,920 s.f. NA
413+00 Wetland 1-C PEM 40.728722 -80.162994 NA NA Temporary Disturbance for Perimeter Erosion Control for Abutting Restoration Temp NA NA 31 x 25 ft. 391 s.f.
415+50 GP-ACCESS-
Stream 10-20
Perennial 40.727708 -80.162733 Brush Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 58 x 20 ft. 529 s.f. 131 x 100 ft. 13,108 s.f. NA
446+00 GP-ACCESS-
Stream 9-43.1
Ephemeral 40.719034 -80.162925 UNT to Trib 34825 to Brush Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 10 x 20 ft 166 s.f. 76 x 100 ft. 7,635 s.f. NA
452+50 Wetland W-20200327-
1250-DWL
PEM 40.717354 -80.162687 Wetland NA Slope Repair Perm NA NA 18 x 13 ft. 242 s.f.
452+75 OUT-Stream 9-42 Perennial 40.717309 -80.162798 Tributary 34825 to Brush Creek WWF Outfall Perm NA 4 x 4 ft.
16 s.f.
NA
453+00 Wetland 9-BZ # 2 PEM 40.717286 -80.162847 Wetland N/A Waterbar Removal Temp NA NA 11 x 10 ft. 45 s.f.
453+25 Wetland 9-BZ PEM 40.717122 -80.162900 NA NA Slope repair, removal of slide debris, planting for restoration Temp NA NA 91 x 25 ft. 1,796 s.f.
453+25 Stream 9-42 Perennial 40.717080 -80.162820 Tributary 34825 to Brush Creek WWF Slope repair, removal of slide debris and planting for restoration Temp 90 x 5 ft. 373 s.f. 158 x 75 ft. 11,701 s.f. NA
459+50 GP-ACCESS-
Wetland 2-AL
PEM 40.715472 -80.162935 Wetland NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 5 x 3 ft.
16 s.f.
459+50 GP-ACCESS-
Stream 9-68
Perennial 40.715488 -80.162869 Trib 34824 to Brush Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 10 x 20 ft 198 s.f. 75 x 115 ft. 8,619 s.f. NA
462+75 GP-ACCESS-
Stream 9-72
Perennial 40.714553 -80.162621 UNT to Trib 34824 to Brush Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 5 x 20 ft.
61 s.f.
203 x 100 ft. 20,384 s.f. NA
463+25 GP-ACCESS-
Wetland W-20200327-1126-
JWR-C
PEM 40.714509 -80.162586 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 6 x 5 ft.
32 s.f.
470+50 GP-ACCESS-
Stream 9-67
Ephemeral 40.712522 -80.162615 UNT to Trib 34825 to Brush Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 4 x 20 ft.
64 s.f.
94 x 100 9,370 s.f. NA
521+50 Wetland 9-CF PEM 40.705147 -80.172622 NA NA Grading w/in wetland for restoration Temp NA NA 212 x 20 ft. 2,831 s.f.
52+50 Stream 9-81 Intermittent 40.704821 -80.172600 UNT to Tributary 36575 to Crows Run WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized) 67 x 19 ft. 1,310 s.f. NA
521+50 Stream 9-82 Perennial 40.705591 -80.172675 UNT to Tributary 36575 to Crows Run WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized)1 147 x 140 ft. 10,526 s.f. NA
527+00 ACCESS-
Wetland 9-CF
PEM 40.704315 -80.172555 NA NA Temporary equipment access >200ft Temp NA NA 446 x 20 6,724 s.f.
596+25 Stream 11-5 Ephemeral 40.691090 -80.183172 Tributary 36572 to Crows Run WWF Grading w/in stream channel and floodway for restoration Temp 13 x 2 ft.
19 s.f.
45 x 15 ft. 270 s.f. NA
639+00 Stream 11-8 Intermittent 40.686788 -80.196138 UNT to Crows Run WWF Grading w/in floodway for restoration Temp 0 54 x 44 ft. 1,950 s.f. NA
657+50 Wetland W-20200407-
0920-DWL-A
PEM 40.686948 -80.202833 NA NA Waterbar Removal Temp NA NA 134 x 15 ft. 822 s.f.
684+50 Wetland 13-C PSS 40.680143 -80.205356 NA NA Grading w/in wetland for restoration Temp NA NA 12 x 6 ft.
33 s.f.
684+50 Stream 11-12 Perennial 40.680100 -80.205333 Pine Run WWF Grading w/in floodway and stream bank stabilization for restoration Temp 51 x 7 ft. 287 s.f. 140 x 53 ft. 5,860 s.f. NA
684+50 GP-ACCESS-
Stream 11-12
Perennial 40.680107 -80.205286 Pine Run WWF GP-8 Temporary Equipment Crossing Temp 17 x 12 ft. 87 s.f. 33 x 16 ft. 523 s.f. NA
689+25 Stream 11-30 (Crows Run) Perennial 40.678985 -80.204919 Crows Run WWF Bank Stabilization Temp 73 x 18 ft. 897 s.f. 69 x 64 ft. 4,473 s.f. NA
689+25 GP-ACCESS-
Wetland W-20200427-1145-
DWL
PEM 40.679069 -80.204877 Wetland NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 8 x 19 ft. 203 s.f.
705+75 Stream 9-2-11 Intermittent 40.678460 -80.210577 UNT to Crows Run WWF Slope Repair, Bank Stabilization Temp 88 x 8 ft. 312 s.f. 84 x 100 ft. 5,822 s.f. NA
707+00 Wetland 28-A PEM 40.678149 -80.210982 NA NA Waterbar Removal Temp NA NA 15 x 13 ft. 173 s.f.
733+00 Stream 2-14 Intermittent 40.677701 -80.220032 UNT to Crows Run WWF Slope Repair Temp 0 112 x 49 ft. 5,515 s.f. NA
735+00 Stream 2-15 Ephemeral 40.677737 -80.220654 UNT to Crows Run WWF Slope Repair Temp 0 280 x 40 ft. 11,180 s.f. NA
764+75 Stream 2-19 Perennial 40.676400 -80.229431 UNT to Crows Run WWF Slope Repair and Bank Stabilization Temp 139 x 5 ft. 608 s.f. 134 x 56 ft. 7,533 s.f. NA
766+25 Stream 27-1 (78A) Intermittent 40.676457 -80.229736 UNT to Crows Run WWF Slope Repair Temp 0 29 x 29 ft. 835 s.f. NA
765+50 Stream 27-1 (78B) Intermittent 40.676327 -80.230030 UNT to Crows Run WWF Slope Repair Temp 0 49 x 22 ft. 1,078 s.f. NA
789+00 Crows Run (Stream 2-20) # 1 Perennial 40.673595 -80.237104 Crows Run WWF Slope Repair Temp 154 x 12 ft. 1,894 s.f. 154 x 12 ft. 1,827 s.f. NA
789+00 Crows Run (Stream 2-20) # 2 Perennial 40.673595 -80.237104 Crows Run WWF Vegetated Riprap Perm 154 x 7 ft. 1,111 s.f. 154 x 4 ft. 676 s.f. NA
868+00 Stream 60-3 Intermittent 40.669601 -80.262857 UNT to Elkhorn Run WWF Slope Repair Temp 0 18 x 96 ft. 1,710 s.f. NA
872+00 Stream 2-25 Intermittent 40.669282 -80.264565 UNT to Elkhorn Run WWF Slope Repair Temp 0 33 x 48 ft. 1,578 s.f. NA
872+00 OUT-Stream S-20200401-1417-DWL Ephemeral 40.669292 -80.264439 UNT to Elkhorn Run WWF Outfall Perm 0 6 x 6 ft.
36 s.f.
NA
872+00 Stream S-20200401-1417-DWL Ephemeral 40.669294 -80.264523 UNT to Elkhorn Run WWF Slope Repair Temp 0 55 x 32 ft. 1,780 s.f. NA
889+00 Stream 2-24 (Elkhorn Run)
# 1
Perennial 40.668917 -80.269928 Elkhorn Run WWF Slope Repair Temp 0 155 x 26 ft. 4,097 s.f. NA
889+50 Stream 2-24 (Elkhorn Run)
# 2
Perennial 40.668737 -80.270145 Elkhorn Run WWF Grading w/in stream channel and floodway for restoration Temp 117 x 22 ft. 469 s.f. 270 x 57 ft. 10,846 s.f. NA
889+50 Wetland W-20200317-
1127-DWL
PEM 40.668975 -80.270241 NA NA Grading w/in wetland for restoration Temp NA NA 14 x 6 ft.
41 s.f.
962+00 Stream 2-29 Perennial 40.651551 -80.277166 Trib 36549 to Elkhorn Run Floodway WWF Slope Repair Temp 0 87 x 44ft. 3,836 s.f. NA
962+00 GP-ACCESS-
Wetland W-20200330-
1546-DWL
PEM 40.651391 -80.277103 Wetland NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 17 x 12 ft. 206 s.f.
972+00 GP-ACCESS-
Wetland W-20200330-
1615-DWL-B
PEM 40.649212 -80.279033 Wetland NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 20 x 17 ft. 343 s.f.
1046+00 GP-ACCESS-
Wetland 2-F
PEM 40.636204 -80.296495 NA NA GP-8 Temporary equipment crossing (timber mat) Temp NA NA 61 x 37 ft. 1,045 s.f.
1046+00 Stream 2-9 Perennial 40.636082 -80.296679 NA WWF Grading w/in floodway for restoration Temp 0 93 x 31 ft. 2,614 s.f. NA
1076+00 Wetland 2-R # 1 PEM 40.629297 -80.303134 NA NA Waterbar Removal Temp NA NA 42 x 11 ft. 342 s.f.
1078+00 Wetland 2-R # 2 PEM 40.629207 -80.303192 NA NA Grading w/in wetland for restoration Temp NA NA 64 x 27 ft. 741 s.f.
1078+00 Stream 2-31 Intermittent 40.629233 -80.303218 Logtown Run WWF Grading w/in floodway for restoration Temp 0 76 x 64 ft. 2,701 s.f. NA
1091+00 Stream S-20200418-1236-JWR # 2 Ephemeral 40.626272 -80.305451 UNT to Raccoon Creek WWF Temporary floodway impact due to BMP installation for adjacent restoration Temp 0 67 x 50 ft. 3,240 s.f. NA
1091+50 GP-ACCESS-
Stream 9-135
Ephemeral 40.625485 -80.305623 UNT to Raccoon Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 23 x 20 ft. 298 s.f. 161 x 20 ft. 2,937 s.f. NA
1097+75 GP-ACCESS-
Stream 9-138
Intermittent 40.624625 -80.306145 UNT to Raccoon Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 20 x 2 ft.
40 s.f.
175 x 20 ft. 3,500 s.f. NA
1097+50 Stream 9-138 Intermittent 40.624694 -80.306228 UNT to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 80 x 2 ft. 180 s.f. 79 x 48 ft. 2,625 s.f. NA
1096+75 GP-ACCESS-
Stream 9-137
Intermittent 40.624816 -80.306083 UNT to Raccoon Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 0 58 x 20 ft. 1,150 s.f. NA
1097+50 Stream 9-137 Intermittent 40.624722 -80.306008 UNT to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 44 x 7 ft. 123 s.f. 59 x 52 ft. 1,930 s.f. NA
1094+50 GP-ACCESS-
Stream 9-136
Perennial 40.625450 -80.305642 UNT to Raccoon Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 8 x 20 ft. 156 s.f. 163 x 20 ft. 2,746 s.f. NA
1097+50 Stream 9-136 (RP-108) Perennial 40.624532 -80.305920 UNT to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 20 x 10 ft. 21 s.f. 103 x 53 ft. 4,801 s.f. NA
1103+00 Stream 9-136 (RP-108A) Perennial 40.623120 -80.306449 UNT to Raccoon Creek WWF gracing w/in stream channel and floodway for restoration Temp 13 x 3 ft.
21 s.f.
50 x 50 ft. 2,587 s.f. NA
1113+00 OUT-Stream S-20200402-1440-DWL Ephemeral 40.621966 -80.309829 UNT to Raccoon Creek WWF Outfall Perm 24 x 4 ft.
96 s.f.
25 x 43 ft. 1,072 s.f. NA
1113+00 Stream S-20200402-
1440-DWL
Ephemeral 40.621966 -80.309829 UNT to Raccoon Creek WWF Slope Repair Temp 0 25 x 43 ft. 1,072 s.f. NA
1121+75 OUT-Stream 13-109 Ephemeral 40.620813 -80.312694 UNT to Raccoon Creek WWF Outfall Perm 25 x 6 ft. 150 s.f. 25 x 106 ft. 2,650 s.f. NA
1124+50 OUT-Stream 9-10-24 Perennial 40.621210 -80.313836 Trib 33581 to Raccoon Creek WWF Outfall Perm 0 9 x 13 ft. 117 s.f. NA
1124+50 Stream 9-10-24 Perennial 40.621210 -80.313836 Trib 33581 to Raccoon Creek WWF Slope Repair Temp 0 219 x 49 ft. 10,730 s.f. NA
1169+50 Stream 9-29 Intermittent 40.616603 -80.329037 UNT to Raccoon Creek WWF Slope Repair Temp 0 113 x 34 ft. 3,859 s.f. NA
1169+50 OUT-Stream
9-28 (Raccoon Creek)
Perennial 40.616658 -80.329217 Raccoon Creek WWF Outfall Perm 0 68 x 6 ft. 402 s.f. NA
1169+50 Stream 9-28 (Raccoon Creek) Perennial 40.616733 -80.329192 Raccoon Creek WWF Slope Repair Temp 0 63 x 123 ft. 7,642 s.f. NA
1193+00 Wetland 9-AG (2-AG) PEM 40.611579 -80.330028 NA NA Grading w/in wetland for restoration Temp NA NA 115 x 37 ft. 3,013 s.f.
1197+00 GP-ACCESS-
Wetland 20200421-
1215-CWI
PEM 40.610475 -80.330144 NA NA GP-8 Temporary Equipment Access Temp NA NA 144 x 41 ft. 3,920 s.f.
1213+00 OUT-Stream
37-1
Ephemeral 40.607685 -80.325821 UNT to Trib 33580 to Raccoon Creek WWF Outfall Perm 0 60 x 25 ft 1,500 s.f. NA
1213+00 Stream 9-113 Perennial 40.606406 -80.327059 Trib 33580 to Raccoon Creek Floodway WWF Slope Repair Temp 0 54 x 38 ft 2,070 s.f. NA
1213+00 OUT-Stream
9-113
Perennial 40.606457 -80.327048 Trib 33580 to Raccoon Creek Floodway WWF Outfall Perm 0 4 x 4 ft
16 s.f.
NA
1213+00 Stream 9-112 Ephemeral 40.606797 -80.327088 UNT to Trib 33580 to Raccoon Creek WWF Slope Repair Temp 0 134 x 53 ft 7,066 s.f. NA
1213+00 OUT-Stream 9-112 # 1 Ephemeral 40.606533 -80.327039 UNT to Trib 33580 to Raccoon Creek WWF Outfall Perm 0 4 x 4 ft
16 s.f.
NA
1213+00 OUT-Stream 9-112 # 2 Ephemeral 40.606589 -80.327032 UNT to Trib 33580 to Raccoon Creek WWF Outfall Perm 0 4 x 4 ft
16 s.f.
NA
1213+00 Stream 9-112.1 Intermittent 40.606808 -80.326991 UNT to Trib 33580 to Raccoon Creek WWF Slope Repair Temp 0 59 x 24 ft. 1,431 s.f. NA
1213+00 OUT-Stream
9-112.1
Intermittent 40.606858 -80.327001 UNT to Trib 33580 to Raccoon Creek WWF Outfall Perm 0 4 x 4 ft
16 s.f.
NA
1216+00 Stream 9-114 Perennial 40.606293 -80.327474 UNT to Trib 33580 to Raccoon Creek Floodway WWF Slope Repair Temp 0 95 x 41 ft. 3,892 s.f. NA
1212+00 Wetland W-20200403-
1342-DWL
PEM 40.607442 -80.327084 NA NA Slope Repair Perm NA NA 24 x 23 ft. 549 s.f.
1215+00 Wetland W-20200403-
1114-DWL
PEM 40.606675 -80.327267 NA NA Slope Repair Perm NA NA 16 x 11 ft. 175 s.f.
1265+50 Stream 9-63 Perennial 40.593311 -80.328129 Frames Run WWF Slope Repair, Grading w/in stream channel and floodway for restoration Temp 373 x 15 ft. 5,591 s.f. 315 x 100 ft. 31,505 s.f. NA
1267+00 Wetland 73-D PEM 40.592974 -80.327675 NA NA Temporary impact due to pump-around and coffer dam installation for adjacent stream restoration Temp NA NA 21 x 5 ft.
49 s.f.
1305+00 Stream 9-164 Ephemeral 40.585055 -80.333557 UNT to Tributary 33594 to Service Creek WWF Grading w/in stream channel and floodway for restoration Temp 111 x 15 ft. 848 s.f. 174 x 93 ft. 10,644 s.f. NA
1305+00 Wetland W-20200421-
1025-JWR
PEM 40.584982 -80.333651 NA NA Grading w/in wetland for restoration Temp NA NA 12 x 9 ft.
91 s.f.
1312+00 Stream 9-162 Perennial 40.584505 -80.335892 Trib 33594 to Service Creek WWF Slope Repair Temp 0 145 x 52 ft. 7,561 s.f. NA
1350+50 Stream 9-2-34 Perennial 40.576691 -80.334797 UNT to Service Creek WWF Slope Repair Temp 0 108 x 14 ft. 1,532 s.f. NA
1350+50 OUT-Stream 9-2-34 Perennial 40.576522 -80.334857 UNT to Service Creek WWF Outfall Perm 0 4 x 3 ft.
12 s.f.
NA
1363+00 GP-ACCESS-
Wetland W-20200415-1132-
JWR-C
PEM 40.575010 -80.331003 wetland NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 67 x 26 ft. 963 s.f.
1370+00 Stream 9-151 Ephemeral 40.573296 -80.331826 UNT to Service Creek WWF Grading w/in stream channel and floodway for restoration Temp 140 x 11 ft. 1343 s.f. 97 x 71 ft. 4,791 s.f. NA
1370+00 Stream 9-152 Perennial 40.573512 -80.332052 UNT to Service Creek WWF Grading w/in stream channel and floodway for restoration Temp 135 x 12 ft. 733 s.f. 120 x 110 ft. 10,060 s.f. NA
1411+50 Wetland 31-A PEM 40.562223 -80.330260 NA NA Waterbar Removal Temp NA NA 84 x 15 ft. 737 s.f.
1414+00 Wetland 9-EI PEM 40.561632 -80.329976 NA NA Grading w/in wetland for restoration Temp NA NA 59 x 40 ft. 1469 s.f.
1414+00 Stream 9-153 Perennial 40.561537 -80.329957 UNT to Tributary 33659 of Raccoon Creek WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized)1 145 x 70 ft. 5,689 s.f. NA
1431+00 Wetland 9-EN PEM 40.558901 -80.334310 NA NA Waterbar Removal Temp NA NA 111 x 39 ft. 790 s.f.
1467+50 ACCESS-Stream 2-36 Perennial 40.551972 -80.34066 Tributary 33660 to Raccoon Creek WWF Temporary equipment crossing; fill over culvert exceeds GP threshold Temp 20 x 17 ft. 348 s.f 227 x 125 ft. 17,032 s.f. NA
1495+00 Stream 2-35 Perennial 40.545196 -80.343404 UNT to Obney Run WWF Slope Repair, Bank Stabilization Temp 110 x 11 ft. 1,232 s.f. 99 x 50 ft. 4,969 s.f. NA
1498+50 Wetland W-20200821-
1130-RDM
PEM 40.544223 -80.342971 Wetland NA Slope Repair Perm NA NA 3 x 6 ft.
18 s.f.
1539+75 Stream 9-109 (Stream 13-107B) Perennial 40.534851 -80.351353 UNT to Raccoon Creek WWF Slope Repair, Bank Stabilization Temp 152 x 16 ft. 864 s.f. 154 x 126 ft. 9,810 s.f. NA
1539+75 Wetland 42-D (RP-151) PEM 40.534747 -80.351206 NA NA Temporary Disturbance for Abutting Channel Restoration Temp NA NA 146 x 31 ft. 1,801 s.f.
1569+50 Wetland 27-I PEM 40.528063 -80.351112 NA NA Waterbar Removal Temp NA NA 28 x 9 ft. 174 s.f.
1627+00 to 1632+00 Stream 10-52 (Raccoon Creek) Perennial 40.514074 -80.351202 Raccoon Creek WWF Grading w/in floodway for restoration Temp 0 20 x 17 ft. 348 s.f. NA
1627+00 Wetland W-20200401-
1043-JWR-A
PEM 40.513270 -80.351006 NA NA Removal of fill. Temp NA NA 17 x 53 ft. 906 s.f.
1641+50 Stream 9-36 Perennial 40.509608 -80.350739 UNT to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 280 x 5 ft. 1,282 s.f. 280 x 42 ft. 7,377 s.f. NA
1645+50 Wetland 9-AK PEM 40.508450 -80.350940 NA NA Temporary Disturbance for Perimeter Erosion Control for Abutting Restoration Temp NA NA 8 x 64 ft. 338 s.f.
1645+50 Stream S-20200401-0911-JWR Intermittent 40.508450 -80.350940 UNT to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 77 x 3 ft. 187 s.f. 105 x 94 ft. 5,232 s.f. NA
1645+50 GP-ACCESS-
Stream S-20200401-0911-
JWR
Intermittent 40.508449 -80.350915 UNT to Raccoon Creek WWF GP-8 Temporary Equipment Access for Slope Stabilization Temp 0 34 x 20 ft. 757 s.f. NA
1646+00 GP-ACCESS-
Wetland W-20200331-1310-
JWR-A
PEM 40.508000 -80.351000 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 20 x 18 ft. 365 s.f.
1646+00 GP-ACCESS-
Wetland W-20200331-1310-
JWR-B
PEM 40.508000 -80.351000 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 20 x 30 ft. 599 s.f.
1694+50 Stream 9-37 Intermittent 40.496315 -80.349556 UNT to Tributary 33750 to Raccoon Creek WWF Grading w/in stream channel and floodway for restoration Temp 331 x 3 ft. 784 s.f. 305 x 108 ft. 29,011 s.f. NA
1697+00 Stream 10-43 Intermittent 40.495966 -80.349247 UNT to Raccoon Creek WWF Grading w/in floodway for restoration Temp 0 76 x 20 ft. 566 s.f. NA
1694+50 Wetland W-20200409-
1558-DWL
PEM 40.496491 -80.349309 NA NA Grading w/in wetland for restoration Temp NA NA 89 x 6 ft. 367 s.f.
1741+00 ACCESS-
Wetland 10-Q
PEM 40.489555 -80.357903 NA NA Temporary equipment crossing >200ft. Temp NA NA 914 x 20 16,840 s.f.
1740+50 GP-ACCESS-
Wetland 15-A
PEM 40.490033 -80.357365 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 60 x 20 1,199 s.f.
1740+00 Wetland 15-A PEM 40.490458 -80.356875 NA NA Slope Repair Perm NA NA 30 x 23 ft. 655 s.f.
1740+00 OUT-Stream 10-44 Perennial 40.490136 -80.357283 UNT to Raccoon Creek WWF Outfall Perm 0 5 x 5
25 s.f.
NA
1740+00 Stream 10-44 Perennial 40.489900 -80.357212 UNT to Raccoon Creek WWF Temporary Staging Areas Temp 0 104 x 123 ft. 12,796 s.f. NA
1697+00 Stream 10-42 Perennial 40.495531 -80.349389 Trib 33750 to Raccoon Creek WWF Slope Repair Temp 0 125 x 50 6,250 s.f. NA

E:1007220-026 ETC Northeast Pipeline, LLC, 6051 Wallace Road Extension, Third Floor, Wexford, PA 15090, Findlay Township, Allegheny County, Center, Conway, Independence, New Sewickley, Racoon Township(s), Beaver County, Jackson Township, Butler County, Robinson, Smith Townships, Washington County, ACOE Pittsburgh District.

 The Revolution Pipeline project was originally permitted to install a 40.5-mile-long, 24-inch diameter steel natural gas pipeline that connects wells in Butler and Beaver counties to a natural gas processing facility in Washington County, PA. This application is for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities.

 The project is located within the Aliquippa, Baden, Beaver, Clinton, Evans City and Zelienople USGS 7 1/2 Minute Quadrangle Map.

 See E0207220-038; E0407220-023 and E6307220-027 for additional impacts associated with this project.

 On December 12, 2020, the Department of Environmental Protection published the receipt of an application for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities in the Pennsylvania Bulletin [50 Pa.B. 7028]. This public notice was pursuant to 25 Pa. Code Chapter 105.21a. The December 12, 2020 notice appeared under a heading related to Chapter 102 of the Department's regulations. However, this application was received Under the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27), Section 302 of the Flood Plain Management Act (32 P.S. § 679.302), and Requests for Certification under Section 401 of the Federal Water Pollution Control Act (33 U.S.C.A. § 1341(a)).

 Impacts associated with this permit:

Nearest
Station
Location
Structure/
Activity
Unique
Identifier
Aquatic Resource Type Latitude dd nad83 Longitude dd nad83 Waters Name Pa. Code Chapter 93 Designation Work Proposed(1) DEP Impact Type Temp/
Perm
Watercourse Impact Linear foot (along channel) x Width (Top of Banks) Length and Width (feet) Floodway Impact Top of Bank Landward

Length and Width (feet) Area (square feet)
Wetland Impact

Length and Width (feet) Area (square feet)
0+00 Stream 25-1 Intermittent 40.783448 -80.081179 UNT to Tributary 35017 to Breakneck Creek WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized)1 203 x 106 ft. 13,024 s.f. NA
2+00 (OFF ROW) Wetland W-20200424-0940-MRM PSS 40.782530 -80.081215 NA NA Grading w/in wetland for stream restoration Temp NA NA 66 x 54 ft. 2,831 s.f.
76+00 Wetland 9-K PEM 40.776968 -80.103685 NA NA Waterbar Removal Temp NA NA 19 x 15 ft. 268 s.f.
82+00 Stream 9-11 Ephemeral 40.776960 -80.106013 UNT to Trib 34910 To Glade Run WWF Temporary access and stockpiling for riparian plantings Temp 0 91 x 31 ft. 1,430 s.f. NA
82+00 GP-ACCESS-
Wetland W-20200416-1045-
DWL-B
PEM 40.776862 -80.106156 NA NA GP-8 Temporary equipment crossing (timber mat) Temp NA NA 16 x 10 ft. 109 s.f.
82+00 GP-ACCESS-
Wetland W-20200416-1045-
DWL-C
PEM 40.776863 -80.106011 NA NA GP-8 Temporary equipment crossing (timber mat) Temp NA NA 18 x 12 ft. 145 s.f.
117+00 Wetland W-20200423-
1220-CWI-A
PEM 40.777374 -80.117507 NA NA Waterbar Removal Temp NA NA 27 x 15 ft. 360 s.f.
118+50 Wetland 9-T PEM 40.777396 -80.117701 NA NA Grading w/in wetland for restoration Temp NA NA 22 x 15 ft. 164 s.f.
118+50 Stream 9-18 Perennial 40.777449 -80.117648 UNT to Tributary 34910 to Glade Run WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized) 108 x 74 ft. 5,272 s.f. NA
147+50 Wetland 2-J PEM 40.774729 -80.124884 NA NA Waterbar Removal Temp NA NA 40 x 15 ft. 417 s.f.
HDD Pullback Wetland 25-F PEM 40.771324 -80.137431 NA NA Waterbar Removal Temp NA NA 75 x 15 ft. 743 s.f.
223+00 Wetland W-20200318-
1324-DWL-A
PEM 40.769824 -80.144880 NA NA Waterbar Removal Temp NA NA 37 x 15 ft. 397 s.f.
223+50 Stream 10-14 Intermittent 40.769858 -80.146470 UNT to Tributary 34909 to Glade Run WWF Grading w/in floodway for restoration Temp GP-8 (previously authorized)1 76 x 64 ft. 4,381 s.f. NA
223+50 Wetland 9-CO PEM 40.769876 -80.146543 NA NA Grading w/in wetland for adjacent stream restoration Temp NA NA 46 x 77 ft. 2,039 s.f.
223+50 Wetland 9-CP PEM 40.769819 -80.146462 NA NA Grading w/in wetland for adjacent stream restoration Temp NA NA 17 x 76 ft. 907
250+50 Wetland 65-H PEM 40.765731 -80.152841 NA NA Waterbar Removal Temp NA NA 118 x 15 ft. 1,210 s.f.

E6307220-027; ETC Northeast Pipeline, LLC, 6051 Wallace Road Extension, Third Floor, Wexford, PA 15090, Findlay Township, Allegheny County, Center, Conway, Independence, New Sewickley, Racoon Township(s), Beaver County, Jackson Township, Butler County, Robinson, Smith Townships, Washington County, ACOE Pittsburgh District.

 The Revolution Pipeline project was originally permitted to install a 40.5-mile-long, 24-inch diameter steel natural gas pipeline that connects wells in Butler and Beaver counties to a natural gas processing facility in Washington County, PA. This application is for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities.

 The project is located within the Aliquippa, Baden, Beaver, Clinton, Evans City and Zelienople USGS 7 1/2 Minute Quadrangle Map.

 See E0407220-023; E1007220-026 and E0207220-038 for additional impacts associated with this project.

 On December 12, 2020, the Department of Environmental Protection published the receipt of an application for the proposed restoration and on-site mitigation of aquatic resources impacted by the initial Revolution Pipeline construction, slope failures along the Revolution Pipeline ROW and the reconstruction of slope failures along the Revolution Pipeline ROW, the use of off-site mitigation for permanent impacts that cannot be restored on-site, unavoidable impacts to waters associated with landslide remediation and slope stabilization, and temporary impacts to waters for access for restoration and remediation activities in the Pennsylvania Bulletin [50 Pa.B. 7028]. This public notice was pursuant to 25 Pa. Code Chapter 105.21a. The December 12, 2020 notice appeared under a heading related to Chapter 102 of the Department's regulations. However, this application was received Under the Dam Safety and Encroachments Act (32 P.S. §§ 693.1—693.27), Section 302 of the Flood Plain Management Act (32 P.S. § 679.302), and Requests for Certification Under Section 401 of the Federal Water Pollution Control Act (33 U.S.C.A. § 1341(a)).

Nearest
Station Location
Structure/
Activity
Unique
Identifier
Aquatic Resource Type Latitude dd nad83 Longitude dd nad83 Waters Name Pa. Code Chapter 93 Designation Work Proposed(1) DEP Impact Type Temp/
Perm
Watercourse Impact Linear foot (along channel) x Width (Top of Banks) Length and Width (feet) Floodway Impact Top of Bank Landward

Length and Width (feet) Area (square feet)
Wetland Impact

Length and Width (feet) Area (square feet)
2017+00 GP-ACCESS-
Wetland 9-EV
PEM 40.438000 -80.346500 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 70 x 20 1,424 s.f.
2043+50 GP-ACCESS-
Wetland 9-FH
PEM 40.435290 -80.354900 NA NA GP-8 Temporary Equipment Access for Slope Stabilization Temp NA NA 20 x 20 ft. 422 s.f.
2069+00 Wetland 30-BA PEM 40.428765 -80.352872 NA NA Waterbar Removal Temp NA NA 131 x 15 ft. 1,818 s.f.

EROSION AND SEDIMENT CONTROL

 The following Erosion and Sediment Control permits have been issued.

 Persons aggrieved by an action may appeal that action to the Environmental Hearing Board (Board) under section 4 of the Environmental Hearing Board Act and 2 Pa.C.S. §§ 501—508 and 701—704. The appeal should be sent to the Environmental Hearing Board, Second Floor, Rachel Carson State Office Building, 400 Market Street, P.O. Box 8457, Harrisburg, PA 17105-8457, (717) 787-3483. TDD users may contact the Board through the Pennsylvania Hamilton Relay Service, (800) 654-5984. Appeals must be filed with the Board within 30-days of publication of this notice in the Pennsylvania Bulletin unless the appropriate statute provides a different time period. Copies of the appeal form and the Board's rules of practice and procedure may be obtained from the Board. The appeal form and the Board's rules of practice and procedure are also available in Braille or on audiotape from the Secretary to the Board at (717) 787-3483. This paragraph does not, in and of itself, create a right of appeal beyond that permitted by applicable statutes and decisional law.

 For individuals who wish to challenge an action, the appeal must reach the Board within 30-days. A lawyer is not needed to file an appeal with the Board.

 Important legal rights are at stake, however, so individuals should show this notice to a lawyer at once. Persons who cannot afford a lawyer may qualify for free pro bono representation. Call the Secretary to the Board at (717) 787-3483 for more information.

Eastern Region: Oil and Gas Management Program Manager, 208 West Third Street, Suite 101, Williamsport, PA 17701-6448

ESCGP-3 # ESG294121006-00
Applicant Name ARD Operating, LLC
Contact Person Jennifer McCarthy
Address 500 Dallas Street, Ste 2930
City, State, Zip Houston, TX 77002-4701
County Lycoming
Township(s) Plunketts Creek
Receiving Stream(s) and Classification(s) Engle Run (EV,  EV)
 Secondary: King Run (HQ-CWF, EV)


STORAGE TANKS

CLOSURE-IN-PLACE VARIANCE


The following variance from closure requirements under the authority of the Storage Tank Spill Prevention Act (35 P.S. § 6021.501) and under 25 Pa. Code Chapter 245, Subchapter E, has been issued by the Bureau of Environmental Cleanup and Brownfields, P.O. Box 8762, Harrisburg, PA 17105-8762.

Variance No. Applicant Name & Address County Municipality Tank Type Tank Capacity
U-21-0001 Joshua Worth
Wawa Inc.
260 West Baltimore Pike
Wawa, PA 19063-5699
Chester London Grove Township Gasoline 20,000 gallons

 The variance request asks that underground storage tank (UST) tank 001 be excluded from part of the UST closure requirements located in 25 Pa. Code § 245.452(b). Specifically, the variance requests that tank 001 be permanently closed without being removed from the ground or filled with a non-shrinking, inert solid material as required by regulation. Instead, a double-walled bulkhead will be installed within tank 001 to create two new USTs each with a capacity of 10,000 gallons. A variance was granted subject to the following conditions: (1) Wawa shall comply with all remaining applicable requirements of 25 Pa. Code Chapter 245 and shall not violate any applicable provision of the Storage Tank and Spill Prevention Act; (2) The double-walled bulkhead to be built within tank 001 to create the two new USTs shall be installed within one (1) year of performing the required site assessment for tank 001; (3) The double-walled bulkhead shall be installed and tested in accordance with the requirements outlined in the submitted ''Containment Solutions—Field Procedure for SW and DW Bulkhead Installation No. PEC 24.02 Dated 02/10/21'' and installed and tested in accordance with the requirements outlined in the submitted ''JD2 Environmental Inc.—Request for Variance Professional Engineer Review—Action Requested: Conversion of Double-Wall Fiberglass UST to a Two (2) Compartment Tank System'' as stamped and sealed by John J. Traynor, P.E, License No. PE038941R on May 12, 2021; and (4) This Conditional Variance Approval will remain in effect until May 18, 2024, unless amended or revoked by the Department or terminated for any reason by Wawa Inc. or the Department.

CORRECTIVE ACTION UNDER
ACT 32, 1989

PREAMBLE 3


The Department of Environmental Protection (DEP) Has Taken Action on the Following Plans And Reports Under the Storage Tank and Spill Prevention Act (35 P.S. §§ 6021.101—6021.2104).

 Provisions of 25 Pa. Code Chapter 245, Subchapter D, Administration of the Storage Tank and Spill Prevention Program, require DEP to publish in the Pennsylvania Bulletin a notice of its final actions on plans and reports.

 A remedial action plan is submitted to summarize the site characterization, document the design and construction details for the remedial action, and describe how the remedial action will attain the selected remediation standard. The remedial action plan also provides results of studies performed and data collected to support the remedial action and a description of postremediation care requirements. A remedial action completion report is submitted to document cleanup of a release of a regulated substance at a site to the selected remediation standard. A remedial action completion report provides a description of the site investigation to characterize the nature and extent of contaminants in environmental media, the basis of selecting the environmental media of concern, documentation supporting the selection of residential or nonresidential exposure factors, a description of the remediation performed and summaries of sampling methodology and analytical results which demonstrate that the remediation has attained the cleanup standard selected.

 DEP may approve or disapprove plans and reports submitted. This notice provides DEP's decision and, if relevant, the basis for disapproval.

 For further information concerning the plans and reports, please contact the Environmental Cleanup Program Manager in the DEP Regional Office under which the notice of the plan or report appears. If information concerning a report is required in an alternative form, contact the Community Relations Coordinator at the appropriate Regional Office listed. TDD users may telephone DEP through the Pennsylvania Hamilton Relay Service at (800) 654-5984.

 DEP has received the following plans and reports:

Northwest Regional Office: Environmental Cleanup & Brownfields Program, 230 Chestnut Street, Meadville, PA 16335-3481, 814-332-6648.

Contact: Kim Bontrager, Clerk Typist 3.

Kwik Fill M 2, Storage Tank Facility ID # 25-22460, 55001 Peach Street, Erie, PA 16509, Millcreek Township, Erie County. CORE Environmental Services, Inc., 3960 William Flynn Hwy, Suite 100, Allison Park, PA 15101, on behalf of United Refining Company, 15 Bradley Street, Warren, PA 16528, submitted a combined Remedial Action Plan and Remedial Action Completion Report concerning remediation of soil and groundwater contaminated with benzene, toluene, ethylbenzene, xylenes, methyl tertiary butyl ether, cumene and naphthalene. The combined Remedial Action Plan and Remedial Action Completion Report did not demonstrate attainment of the residential site-specific standard and was disapproved by DEP on May 21, 2021.

Sheetz 58, Storage Tank Facility ID # 16-29460, 1281 East Main Street, Clarion, PA 16214, Clarion Borough, Clarion County. Envirotrac, Ltd., 176 Thorn Hill Road, Warrendale, PA 15086, on behalf of Sheetz, Inc., 351 Sheetz Way, Claysburg, PA 16625, submitted a Remedial Action Completion Report concerning remediation of soil and groundwater contaminated with unleaded gasoline. The Remedial Action Completion Report demonstrated attainment of the Statewide health standard and was approved by DEP on May 20, 2021.

[Pa.B. Doc. No. 21-895. Filed for public inspection June 4, 2021, 9:00 a.m.]



No part of the information on this site may be reproduced for profit or sold for profit.

This material has been drawn directly from the official Pennsylvania Bulletin full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.