25 Pa. Code § 72.22. Permit issuance.

§ 72.22. Permit issuance.

 (a)  No person may install, award a contract for construction or construct an individual or community onlot sewage system, or install, construct, occupy or use a building to be served by that system without first obtaining a permit from the local agency, except as provided in subsections (c)—(e).

 (b)  A permit shall be required by the local agency for alterations or connections to an existing individual or community onlot sewage system when the alteration or connection requires the repair, replacement or enlargement of a treatment tank or retention tank, or the repair, replacement, disturbance, modification or enlargement of a soil absorption area or spray field, or the soil within or under the soil absorption area or spray field.

 (c)  Multiple installations of chemical toilets or other portable toilets proposed for temporary use at a construction site, a recreation activity or a temporary facility shall be covered by one permit.

 (d)  A permit is not required for the installation of a recycling toilet, incinerating toilet, composting toilet or other type of water conservation device where the existing onlot system will not be altered.

 (e)  Except when a local agency or municipality requires a permit by ordinance, no permit or official plan revision is required for the installation of an individual onlot sewage system for a residential structure occupied or intended to be occupied by the property owner or a member of the property owner’s immediate family on a contiguous tract of land 10 acres or more if the owner of the property was the owner of record as of January 10, 1987. For the purposes of this subsection, the term ‘‘immediate family’’ means a brother, sister, son, daughter, stepson, stepdaughter, grandson, granddaughter, father or mother of the property owner.

 (f)  The installation of a permit-exempt system under subsection (e) is not required to be approved by or meet the standards of the Department or local agency under their rules and regulations for the siting, design or installation of onlot sewage systems, except for the siting requirements of subsection (g), unless a permit is required by a regulation or ordinance of a local agency or municipality, or the person qualifying for the permit exemption chooses to not use the permit exemption. A permit exemption may also be granted where a 10-acre parcel or lot is subdivided from a parent tract after January 10, 1987. When one permit exemption has been granted for a lot, tract or parcel under this section, any lot, tract or parcel remaining after subdivision of the lot or parcel which received the permit exemption or any lots or parcels subdivided from either lot, tract or parcel in the future will not be eligible for a 10-acre permit exemption and shall meet the planning, permitting, siting and construction standards of the Department relating to onlot sewage systems. Owners of a lot, tract or parcel which otherwise qualified for the permit exemption, who do not choose to use the permit exemption remain exempt from the planning requirements of the act with respect to that lot, tract or parcel.

 (g)  Owners of property qualifying for a permit exemption under subsections (e) and (f) shall install permit-exempt systems in accordance with the following siting requirements.

   (1)  The perimeter of the septic tanks and absorption area shall be located at least 200 feet from the perimeter of any property line, nonutility right-of-way, 100-year floodplain or any river, stream, creek, impoundment, well, watercourse, storm sewer, lake, dammed water, pond, spring, ditch, wetland, water supply or any other body of surface water and 10 feet from any utility right-of-way.

   (2)  Before a person who meets the requirements of subsections (e) and (f) for a permit-exempt system installs a system, the person shall notify the local agency of the installation and shall provide documentation relating to the siting requirement of this subsection which is satisfactory to the local agency. The local agency may charge a fee, not to exceed $25, to verify that the system is located in accordance with the siting requirements.

 (h)  A permit is not required when a new dwelling is proposed to replace a previously existing dwelling when the local agency determines that the size and anticipated use of the new dwelling, as determined under § §  73.16 and 73.17 (relating to requirements for absorption areas; and sewage flows), are the same as or less than those of the previously existing dwelling and the previously existing dwelling was in use within 1 year of the anticipated date of completion of construction of the new dwelling. This exception does not apply when an active investigation of a malfunction is under way by the local agency or the Department.

Authority

   The provisions of this §  72.22 amended under sections 7.2 and 9 of the Pennsylvania Sewage Facilities Act (35 P. S. § §  750.7b and 750.9); The Clean Streams Act (35 P. S. § §  691.1—691.1001); and section 1920-A of The Administrative Code of 1929 (71 P. S. §  510-20).

Source

   The provisions of this §  72.22 amended November 1, 1996, effective November 2, 1996, 26 Pa.B. 5347; amended November 7, 1997, effective November 8, 1997, 27 Pa.B. 5877; corrected November 21, 1997, 27 Pa.B. 6079. Immediately preceding text appears at serial pages (221882) to (221883).

Cross References

   This section cited in 25 Pa. Code §  72.22 (relating to permit issuance).