Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 488 (January 27, 2024).

25 Pa. Code § 78.92. Wells in coal areas—surface or coal protective casing is cemented.

§ 78.92. Wells in coal areas—surface or coal protective casing is cemented.

 (a)  In a well underlain by a workable coal seam, where the surface casing or coal protective casing is cemented and the production casing is not cemented or the production casing is not present, the owner or operator shall plug the well as follows:

   (1)  The retrievable production casing shall be removed by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The well shall be filled with nonporous material from the total depth or attainable bottom of the well, to a point 50 feet below the lowest stratum bearing or having borne oil, gas or water. At this point there shall be placed a plug of cement, which shall extend for at least 50 feet above this stratum. Each overlying formation bearing or having borne oil, gas or water shall be plugged with cement a minimum of 50 feet below this formation to a point 50 feet above this formation. The zone between cement plugs shall be filled with nonporous material. The cement plugs shall be placed in a manner that will completely seal the hole. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials approved by the Department. Where the production casing is not retrievable, the operator shall plug that portion of the well under §  78.91(d) (relating to general provisions).

   (2)  After plugging strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to a point approximately 100 feet below the surface or coal protective casing seat, whichever is deeper. At this point, a 100-foot plug of cement shall be installed.

   (3)  After the plug has been installed below the casing seat, the inner casing shall be emptied of liquid from the surface to the plug of cement. A vent or other device approved by the Department shall then be installed on top of the inner string of casing to prevent liquids and solids from entering the well but permit access to the full internal diameter of the inner casing when required. The vent or other device approved by the Department must extend, when finally in place, a distance of at least 72 inches above ground level and the permit or registration number must be permanently affixed.

 (b)  The owner or operator shall plug a well, where the surface casing, coal protective casing and production casing are cemented, as follows:

   (1)  If the total depth or attainable bottom is deeper than the cemented production casing seat, the operator shall plug that portion of the well under subsection (a)(1).

   (2)  Cement plugs shall be set in the cemented portion of the production casing so that the plugs will extend from at least 50 feet below each stratum bearing or having borne oil, gas or water, to a point at least 100 feet above each stratum bearing or having borne, oil, gas or water. A Department-approved mechanical plug may be set 20 feet above each stratum bearing or having borne oil, gas or water as a substitute for the plug of cement. Nonporous material must separate each cement plug or mechanical plug. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other materials as approved by the Department.

   (3)  Following the plugging of the cemented portion of the production casing, the uncemented portion of the production casing shall be separated from the cemented portion and retrieved by applying a pulling force at least equal to the casing weight plus 5,000 pounds or 120% whichever is greater. If this fails, an attempt shall be made to separate the casing by cutting, ripping, shooting or other method approved by the Department, and making a second attempt to remove the casing by exerting a pulling force equal to the casing weight plus 5,000 pounds or 120% of the casing weight, whichever is greater. The maximum distance the stub of the uncemented portion of the production casing may extend is 100 feet below the surface or coal protective casing whichever is lower. In no case may the uncemented portion of the casing left in the well extend through a formation bearing or having borne oil, gas or water. Other stratum above the cemented portion of the production casing bearing or having borne oil, gas or water shall be plugged by filling the hole with nonporous material to 20 feet above the stratum and setting a 50-foot plug of cement. The operator may treat multiple strata as one stratum and plug as described in this subsection with a single column of cement or other material as approved by the Department. When the uncemented portion of the production casing is not retrievable, the operator shall plug that portion of the well under §  78.91(d).

   (4)  After plugging all strata bearing or having borne oil, gas or water, the well shall be filled with nonporous material to a point approximately 100 feet below the surface or coal protective casing seat, whichever is deeper. At this point a 200-foot cement plug shall be placed so that the plug extends from 100 feet below the casing seat to a point at least 100 feet above the casing seat.

   (5)  After the 200-foot plug has been installed, the remainder of the well shall be plugged and vented as described in subsection (a)(3).

 (c)  A person authorized by the Department under the act or section 13 of the Coal and Gas Resource Coordination Act (58 P. S. §  513) to plug a gas well that penetrates a workable coal seam that was drilled prior to November 30, 1955, or which was permitted after that date but not plugged in accordance with the act, shall plug the well to mine through it in the following manner:

   (1)  The gas well shall be cleaned out to a depth of at least 200 feet below the coal seam which is proposed to be mined and, unless impracticable, to a point 200 feet below the deepest mineable coal seam that the well penetrates.

   (2)  The gas well shall be plugged in accordance with section 13(a)(1), (2), (3) or (4) of the Coal and Gas Resource Coordination Act.

Source

   The provisions of this §  78.92 adopted July 28, 1989, effective July 29, 1989, 19 Pa.B. 3229; amended December 16, 1994, effective December 17, 1994, 24 Pa.B. 6284; amended March 30, 2001, effective March 31, 2001, 31 Pa.B. 1736; amended February 4, 2011, effective February 5, 2011, 41 Pa.B. 805. Immediately preceding text appears at serial pages (276333) to (276335).

Cross References

   This section cited in 25 Pa. Code §  78.86 (relating to defective coating or cementing); 25 Pa. Code §  78.91 (relating to general provisions); 25 Pa. Code §  78.97 (relating to plugging a well stimulated with explosives); and 25 Pa. Code §  78.407 (relating to plugging gas storage wells).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.