Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 1032 (February 24, 2024).

25 Pa. Code § 291.205. Erosion control.

§ 291.205. Erosion control.

 (a)  The operator shall manage surface water and control erosion and sedimentation to meet the applicable requirements of Chapter 102 (relating to erosion and sediment control).

 (b)  For land reclamation, rills and gullies shall be filled, graded or otherwise stabilized and the area reseeded or replanted when rills or gullies deeper than 9 inches form in areas where residual waste has been applied or stored.

 (c)  For agricultural utilization, rills and gullies shall be filled, graded or otherwise stabilized and, when necessary, the area reseeded or replanted, when rills or gullies deeper than 3 inches form in areas where residual waste has been applied or stored.

 (d)  Rills or gullies of lesser size shall be stabilized and the area reseeded or replanted if the rills or gullies may result in additional erosion, sedimentation or pollution.

Source

   The provisions of this §  291.205 amended January 12, 2001, effective January 13, 2001, 31 Pa.B. 235. Immediately preceding text appears at serial page (266340).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.