Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 1032 (February 24, 2024).

25 Pa. Code § 88.50. Erosion and sedimentation control plan.

§ 88.50. Erosion and sedimentation control plan.

 The reclamation plan shall include the necessary information to demonstrate how the proposed sediment control measures will meet the requirements of Chapter 102 (relating to erosion and sediment control) and the additional erosion control requirements of Subchapter B, C or D (relating to surface anthracite coal mines: minimum environmental protection performance standards; anthracite bank removal and reclamation: minimum environmental protection performance standards; and anthracite refuse disposal: minimum environmental protection performance standards).

Source

   The provisions of this §  88.50 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382.

Cross References

   This section cited in 25 Pa. Code §  86.261 (relating to program services); and 25 Pa. Code §  88.41 (relating to operation plan: requirements).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.