Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 488 (January 27, 2024).

25 Pa. Code § 89.102. Information requirements.

§ 89.102. Information requirements.

 Each application shall include a plan for each proposed impoundment within the permit area. Each plan shall:

   (1)  Contain a description, map and cross section of the structure and its location.

   (2)  Contain preliminary hydrologic and geologic information required to assess the hydrologic impact of the structure.

   (3)  Contain a survey describing the potential effect on the structure from subsidence of the subsurface strata resulting from past underground mining operations.

   (4)  Include a geotechnical investigation, design and construction requirements for the structure, including a stability analysis if the structure is more than 20-feet high or impounds more than 20 acre-feet.

   (5)  Describe the operation and maintenance requirements for each structure.

Source

   The provisions of this §  89.102 adopted December 19, 1980, 10 Pa.B. 4789, effective July 31, 1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective July 31, 1982, 12 Pa.B. 2382.



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.