Pennsylvania Code & Bulletin
COMMONWEALTH OF PENNSYLVANIA

• No statutes or acts will be found at this website.

The Pennsylvania Code website reflects the Pennsylvania Code changes effective through 54 Pa.B. 488 (January 27, 2024).

52 Pa. Code § 57.143. Existing and planned generating capability.

§ 57.143. Existing and planned generating capability.

 (a)  The Annual Resource Planning Report (ARPR) shall include a description of existing generating capability, the cost of which is being recovered by the EDC in a competitive transition charge, as defined under 66 Pa.C.S. §  2803 (relating to definitions), and planned generating capability installations, changes and removals.

   (1)  The data shall include station name and unit number, location, date installed or to be installed, unit type, primary fuel type and fuel transportation method, summer and winter net capability in megawatts, changes in capability occurring during the past year and percent ownership share.

   (2)  The data shall include those facilities which are owned in whole or in part by the reporting EDC. A jointly owned unit shall be designated as such and the EDC’s share of the unit shall be indicated.

   (3)  The data shall include actual data for the past year and estimated data for the ensuing 5 years.

 (b)  The ARPR shall include a description of existing generating capability and planned generating capability installations, changes and removals for the EDC’s control area and appropriate regional reliability council, as defined under §  57.192 (relating to definitions).

   (1)  The data shall include actual data for the past year and estimated data for the ensuing 5 years.

   (2)  The data shall include station name and unit number, location, date installed or to be installed, unit type, primary fuel type and fuel transportation method and summer and winter net capability in megawatts.

 (c)  The ARPR shall include a synopsis of major occurrences where electric generation suppliers were unable to supply scheduled loads within the EDC’s service territory during the previous year. The synopsis shall include the electric generation supplier’s name, the amount of energy and capacity involved in megawatt-hours and megawatts, respectively, the period of time involved and other pertinent information relating to the major occurrences.

Authority

   The provisions of this §  57.143 amended under the Public Utility Code, 66 Pa.C.S. § §  501, 524, 1501, 1504 and 2809.

Source

   The provisions of this §  57.143 amended February 25, 2000, effective February 26, 2000, 30 Pa.B. 1129. Immediately preceding text appears at serial pages (205868) to (205869).



No part of the information on this site may be reproduced for profit or sold for profit.


This material has been drawn directly from the official Pennsylvania Code full text database. Due to the limitations of HTML or differences in display capabilities of different browsers, this version may differ slightly from the official printed version.